© 2015 General Electric Company. All rights reserved
.
68 |
=
GE Oil & Gas
ES-699 Rev AA
Page 2 of 16
Approved wire seals against ingress of water and dust are required and the NPT
fittings must be sealed with tape or thread sealant in order to meet the highest level
of ingress protection.
Where the protection type depends on wiring glands, the glands must be certified for
the type of protection required.
The metal housing is a die-casting alloy which is predominately aluminum.
Before powering the SVI-II AP:
1. Verify that the pneumatic and electronic cover screws are tightened. This is
important to maintain the ingress protection level and the integrity of the
flameproof enclosure.
2. If the Installation is Intrinsically safe, then check that the proper barriers are
installed and the field wiring meets local and national codes for an IS
installation. Never install a device, which was previously installed without an
intrinsically safe barrier, in an intrinsically safe system.
3. If the pneumatic system is powered by a combustible gas then the installation
must be treated as Zone 0 or DIV I.
4. If the Installation is Non-Incendive, then check that all the electrical
connections are made to approved devices and wiring meets local and
national codes.
5. Verify that the markings on the label are consistent with the application.
6. Verify that the air supply pressure cannot exceed the marking on the
respective label.
Содержание SVI II AP
Страница 6: ...Page Left Blank Intentionally ...
Страница 10: ...This page intentionally left blank ...
Страница 58: ...This page intentionally left blank ...
Страница 84: ... 2015 General Electric Company All rights reserved 84 GE Oil Gas ...
Страница 85: ...Masoneilan SVI II AP Digital Positioner Quick Start Guide 85 2015 General Electric Company All rights reserved ...
Страница 90: ...This page intentionally left blank ...
Страница 91: ......