GE C
OMPANY
D
IRECTION
5472001-1EN, R
EVISION
6
O
PTIMA
CT680 S
ERIES
AND
O
PTIMA
CT670 I
NSTALLATION
M
ANUAL
Page 126
Section 8.0 - PDU Cable Connections & Configuration
8.1.1
Panel - 380 - 480VAC Mains “TS1” Input Power Connection
1.) Remove the TS3 panel front cover.
2.) Strip the wires to fit securely on the power block.
3.) Observe incoming phases (L1, L2 and L3) and insert bare leads into power block.
4.) Insert “vault” ground into PDU “vault” ground lug.
5.) Tighten all fasteners securely and replace the TS3 front panel.
8.1.2
Panel - Circuit Breakers
Place the circuit breakers in the “off/down” position during installation, even with Mains incoming
power tagged and locked out. After you have completed work on the PDU, you may return the circuit
breakers to the “ON” positions.
Figure 2-30 Circuit Breaker Panel
Wire Size AWG
Driver
Bolt/Hex
#18 - 16
1.67 ft-lb (2.3 N-m)
6.25 (8.5 N-m)
#14 - 8
1.67 ft-lb (2.3 N-m)
6.25 (8.5 N-m)
#6 - 4
3.0 ft-lb (4.1 N-m)
12.5 (17 N-m)
#0 - 2/0
29 ft-lb (39.3 N-m)
Table 2-14 Power Wire Torque Values
Wire Size AWG
Driver
Bolt/Hex
#14 - 8
1.67 ft-lb (2.3 N-m)
6.25 (8.5 N-m)
#6 - 4
3.0 ft-lb (4.1 N-m)
12.5 (17 N-m)
#3 - 1
21 ft-lb (28.5 N-m)
#0 - 2/0
29 ft-lb (39.3 N-m)
Table 2-15 Ground Buss Bar Torque Values
CB1
VMR1VMR2
CB4CB5
CB2 CB3
CB6 CB7CB9CB10
Содержание Optima CT680 Series
Страница 205: ...CT ...
Страница 206: ...206 www gehealthcare com ...