Construction Site with Completed Radiology Area
This type of site consists of a finished, dust-free, occupancy-ready radiology suite at a site with
ongoing construction in other areas, but with no remaining construction in or around the scan suite
area. At the time of delivery such sites feature:
•
Dust control measures deployed in the radiology suite area.
•
Scan suite access limited to a single entrance.
•
Radiology suite sealed off from the remaining construction area.
•
Operational HVAC, with a positive air pressure within the radiology suite.
In addition, the radiology suite at such a site REMAINS in a dust-free, occupancy-ready state after
delivery and throughout the remaining construction phase.
For more details, refer to the
Pre-Installation Manual
.
3.4.2
Full Construction Site with Limited Delivery Access
This type of site allows delivery during ongoing construction of the radiology suite area.
Construction site packaging must be ordered and the system is delivered packed for construction
site storage. Packaging cannot be added during the delivery.
At Full Construction sites, delivery occurs prior to site completion, but the product remains stored
until the completion of a finished, dust-free, occupancy-ready radiology suite area. This system is
delivered in sealed packages with dollies. Delivery to the storage area requires a lift truck or riggers.
Installation work can begin
only
when the site reaches the completed, dust-free, occupancy-ready
radiology suite requirement.
3.4.3
Construction Site Unpacking
If room is not completed, follow escalation process. Pre-installation escalation is the process used
to consult CT Engineering, the Design Center, or EHS to resolve pre-installation issues related to
siting concerns and requirements.
A typical construction site package consists of 8-12 packages. Each package is plastic-wrapped in
dust-free packaging. Each package must be vacuumed to remove construction dust prior to moving
components into the CT scan room. This process can add approximately two hours to your
installation time.
Typical components are:
•
Gantry
•
Table
•
Console
•
PDU
•
UPS
•
Lean Cover Cart
•
Lean Install Cart
•
Chair
•
Service Cabinet
Содержание Optima CT680 Series
Страница 205: ...CT ...
Страница 206: ...206 www gehealthcare com ...