GE C
OMPANY
D
IRECTION
5472001-1EN, R
EVISION
6
O
PTIMA
CT680 S
ERIES
AND
O
PTIMA
CT670 I
NSTALLATION
M
ANUAL
Page 74
Section 11.0 - Drill the Anchor Holes
4.) Attach a piece of tape to the ½” concrete drill bit in order to assure a minimum of 100 mm depth
of anchor hole.
5.) ½” Concrete Drill Bit Preparation
Figure 1-53 Drill Bit Preparation
6.) Use the vacuum cleaner to suck up the concrete dust from the hole. Also vacuum dust from
the surrounding area when finished.
7.) Place the bubble level at the positions.
8.) Level the Table using the four adjusters. (The front sides of the adjuster contain the lock nut.
After level adjustment, tighten the lock nuts securely.)
Level Specification: +/- 0.5 mm/1000 mm
Figure 1-54 Table Adjuster and Bubble Level Position
9.) Check that the Cradle is also leveled.
TAPE
100mm or more
SHEET METAL
BASE
TABLE BASE
ADJUSTER
LOCK NUT
ADJUSTER
TABLE BASE
PROPER ANCHOR
ALTERNATIVE ANCHOR
ADJUSTER
BUBBLE LEVEL POSITION
Содержание Optima CT680 Series
Страница 205: ...CT ...
Страница 206: ...206 www gehealthcare com ...