GE C
OMPANY
D
IRECTION
5472001-1EN, R
EVISION
6
O
PTIMA
CT680 S
ERIES
AND
O
PTIMA
CT670 I
NSTALLATION
M
ANUAL
Chapter 2 - Power, Ground & Interconnect Cables
Page 101
2 –
Install
Power
NOTICE
Shortening power cables is not allowed. The crimping tool and ferrules are not shipped with
the system.
If longer or shorter cables are required, order the correct set.
Excess cables cannot be stored under or behind the PDU, gantry or console.
4 PDU to Room Warning Light(s)
cust. supplied
cust. supplied
5 PDU to Scan Room Door Switch
cust. supplied
cust. supplied
50 HVDC Power Cable - PDU to Gantry
2343529
2343529-2
51 HVAC Power Cable - PDU to Gantry
2343530
2343530-2
52 LVAC Power Cable - PDU to Gantry
2343528-3
2343528-4
53 LVAC Power Cable - PDU To Operator’s Console
2343531
2343531-2
54 LVAC Power Cable - Gantry to Table
n/a
n/a
55 Ground, PDU to Raceway
2371450
2371450-2
56 Ground, Raceway to Console
2371450-3
2371450-4
60 LVAC Power Cable - PDU to Optional UPS
-
-
61 LVAC Power Cable - UPS Disconnect Panel to PDU
-
-
90 LVAC Power Cable - PDU to PET
-
-
100 Signal Cable - Gantry to PDU
5419992
5419992-2
101 Signal Cable - Gantry to Console
5419981
5419981-2
102 Signal Cable (Ethernet) - Gantry to Console
5454760-2
5454760
103 Data Cable (Fiber Optic) - Gantry to Console
5478856
5478856-2
104 Signal Cable - Gantry to Table
n/a
n/a
110 Signal Cable - UPS Control to Room Disconnect (A1)
-
-
111 Signal Cable - UPS Control to UPS Disconnect Panel
-
-
RUN
NO. DESCRIPTION
PART NUMBER
L
ONG
C
ABLES
(K
IT
P/N
5444556-2)
S
HORT
C
ABLES
(K
IT
P/N
5444556)
Table 2-3 System Interconnect Cables (Continued)
Содержание Optima CT680 Series
Страница 205: ...CT ...
Страница 206: ...206 www gehealthcare com ...