
MULTILINK ML810 MANAGED EDGE SWITCH – INSTRUCTION MANUAL
D–1
Multilink ML810
Appendix D: Field Installation
instructions for Slot C
module
GE
Digital Energy
Field Installation instructions for Slot C module
(For 3-inch and 5.5-inch wide modular PCB)
The following procedures are only to be performed by a qualified (factory trained &
certified) service technician.
CAUTION
Make sure that all power and data sources are disconnected from the unit prior to
installing or removing the Slot C port module.
NOTE
Note
Proper electro-static discharge (ESD) measures must be used when handling port modules,
which (like most electronic sub-assemblies) are sensitive and subject to damage by static
electricity.
Tools Required
:
•
1 Phillips head screwdriver
•
1/4” Nut Driver
•
ESD Wrist strap or equivalent
ML810x Module Kit:
A Multilink ML810-Series Port Module kit comes in an anti-static bag containing:
•
ML810x module board (1)
•
Matching module faceplate panel (1)
•
5/8” standoffs (4), or (6) for 5.5” PCB4.#4-40 x 3/16” Flat Head screws (6)
•
Labels (as required, if any)
1.
ML810 case cover / Slot C panel removal:
• Wear an ESD wrist strap for grounding before starting these procedures.
• Remove qty. 4 screws securing the ML810 cover to the case (2 top, 2 rear) and
discard screws.
• Slide ML810 cover back (approx. 1/2”) to disengage from case.
• Lift off cover to expose the ML810 interior. See also the photo 1d below.
Содержание MultiLink ML810
Страница 36: ...1 26 MULTILINK ML810 MANAGED EDGE SWITCH INSTRUCTION MANUAL ML810 FIRMWARE UPDATES CHAPTER 1 SPECIFICATIONS ...
Страница 74: ...4 18 MULTILINK ML810 MANAGED EDGE SWITCH INSTRUCTION MANUAL TROUBLESHOOTING CHAPTER 4 OPERATION ...
Страница 328: ...18 38 MULTILINK ML810 MANAGED EDGE SWITCH INSTRUCTION MANUAL MEMORY MAPPING CHAPTER 18 MODBUS PROTOCOL ...