![GE Multilin EPM 2200 Скачать руководство пользователя страница 70](http://html.mh-extra.com/html/ge/multilin-epm-2200/multilin-epm-2200_instruction-manual_128409070.webp)
6–12
EPM 2200 POWER METER – INSTRUCTION MANUAL
PROGRAMMING USING THE FACEPLATE
CHAPTER 6: USING THE METER
2.
Press
ENTER
when
Cnct
is the "active" parameter (i.e. it is in the A screen and
flashing).
This will display the
Cnct
(Connection) screen. To change this setting, use the RIGHT button
to scroll through the three settings. Select the setting that is right for your meter.
The possible Connection configurations are
• 3-element Wye (
3 EL WYE
)
• 2.5-element Wye (
2.5EL WYE
)
• 2 CT Delta (
2 Ct deL
)
as shown below:
3.
Press
ENTER
to scroll through the other
CFG
parameters.
4.
Press
DOWN
or
RIGHT
to display the Password screen (see
Reset Mode
on
page 6–4
for details).
5.
Press
MENU
to return to the main Configuration menu.
6.1.12 Configuring the Communication Port Settings
Use the following procedure to program the communication port (
POrt
) settings of the
RS485 port if you have an EPM 2200 meter with Com Option S: RS485/KYZ output.
NOTE
Note
If you have an EPM 2200 meter with Com Option B (BACnet), the RS485 port is used only for
BACnet and is not programmed.
1.
Push the
DOWN
Button to scroll through the configuration mode parameters.
2.
Press
ENTER
when
POrt
is the active parameter (i.e. it is in the A screen and
flashing) as shown below.
3-Element Wye
2.5-Element Wye
2 CT Delta
Содержание Multilin EPM 2200
Страница 30: ...2 10 EPM 2200 POWER METER INSTRUCTION MANUAL ACCURACY CHAPTER 2 OVERVIEW AND SPECIFICATIONS ...
Страница 54: ...4 20 EPM 2200 POWER METER INSTRUCTION MANUAL ELECTRICAL CONNECTION DIAGRAMS CHAPTER 4 ELECTRICAL INSTALLATION ...
Страница 82: ...6 24 EPM 2200 POWER METER INSTRUCTION MANUAL GE COMMUNICATOR PROGRAMMING OVERVIEW CHAPTER 6 USING THE METER ...
Страница 104: ...A 6 EPM 2200 POWER METER INSTRUCTION MANUAL NAVIGATION MAPS SHEETS 1 TO 4 APPENDIX A EPM 2200 NAVIGATION MAPS ...