3.3.2
Install the Combined Unit
�
�
To install the mCOM10-L1500 plus carrier board into a system
1.
Before installing or removing any board, verify that the system power and external
supplies have been turned off.
2.
Verify that the jumpers, if any, are correctly configured for your application.
3.
Mount the unit very carefully.
4.
Connect all I/O cables.
5.
When all units are correctly fitted into the system and all connections have been
made properly, restore power.
3.4
Initial Startup
A few seconds after powerup, the mCOM10-L1500 system UEFI Firmware banner
displays on the screen. If you do not see any error messages up to this point, the board is
running properly and ready to be installed and configured for your application.
3.4.1
UEFI Firmware Setup
Contact GE Intelligent
Platforms for technical
support. Refer to the section,
�
�
To enter setup during the initial startup sequence:
press the
Delete
or
F2
during the boot up sequence. Adhere to the applicable on-screen messages when
prompted.
22
GFK-2896
Mini COM Express Type 10 Module mCOM10-L1500
For public disclosure
Содержание Mini COM Express 10
Страница 10: ...Notes 10 GFK 2896 Mini COM Express Type 10 Module mCOM10 L1500 For public disclosure...
Страница 14: ...Notes 14 GFK 2896 Mini COM Express Type 10 Module mCOM10 L1500 For public disclosure...
Страница 18: ...Notes 18 GFK 2896 Mini COM Express Type 10 Module mCOM10 L1500 For public disclosure...
Страница 74: ...Notes 74 GFK 2896 Mini COM Express Type 10 Module mCOM10 L1500 For public disclosure...
Страница 80: ...Notes 80 Mini COM Express Type 10 Module mCOM10 L1500 For public disclosure...
Страница 81: ......
Страница 82: ...GE Intelligent Platforms 1 800 433 2682 1 434 978 5100 www ge ip com GFK 2896 For public disclosure...