GE
LOGIQ V5/LOGIQ V3
D
IRECTION
5496012-100, R
EVISION
3
B
ASIC
S
ERVICE
M
ANUAL
-
2 - 1
Chapter 2
Site Preparations
Section 2-1
Overview
2-1-1
Purpose of chapter 2
This chapter provides the information required to plan and prepare for the installation of LOGIQ V5/
LOGIQ V3. Included are descriptions of the facility and electrical needs to be met by the purchaser of
the unit.
Table 2-1
Contents in Chapter 2
Section
Description
Page Number
2-1
Overview
2-1
2-2
General Console Requirements
2-2
2-3
Facility Needs
2-6
Содержание LOGIQ V5
Страница 1: ...GE LOGIQ V5 LOGIQ V3 Basic Service Manual Part Number 5496012 100 Revision 3...
Страница 2: ......
Страница 11: ...GE LOGIQ V5 LOGIQ V3 DIRECTION 5496012 100 REVISION 3 BASIC SERVICE MANUAL ix ZH CN KO...
Страница 27: ......
Страница 116: ...GE LOGIQ V5 LOGIQ V3 DIRECTION 5496012 100 REVISION 3 BASIC SERVICE MANUAL 4 34 Section 4 5 Peripheral Checks...
Страница 145: ......
Страница 169: ......
Страница 170: ...2014 General Electric Company GE GEMedical Systems Ultrasound 9900 Innovation Drive Wawautosa Wisconsin 53226 USA...