GE
LOGIQ V5/LOGIQ V3
D
IRECTION
5496012-100, R
EVISION
3
B
ASIC
S
ERVICE
M
ANUAL
Section 10-4 - Tools Required
10 - 9
10-4-7
Grounding Continuity
Measure the resistance from the third pin of the attachment plug to the exposed metal parts of the case.
The ground wire resistance should be less than 0.2 ohms. Reference the procedure in the IEC 601-1.1.
10-4-7-1
Meter Procedure
Follow these steps to test the ground wire resistance.
1.) Turn the LOGIQ V5/LOGIQ V3 unit OFF.
2.) Plug the unit into the meter, and the meter into the tested AC wall outlet.
3.) Plug the black chassis cable into the meter’s “CHASSIS” connector and attach the black chassis
cable clamp to an exposed metal part of the LOGIQ V5/LOGIQ V3 unit.
4.) Set the meter’s “FUNCTION” switch to the RESISTANCE position.
5.) Set the meter’s “POLARITY” switch to the OFF (center) position.
6.) Measure and record the ground wire resistance.
CAUTION
Electric Shock Hazard. The patient must not be contacted to the equipment during this test.
Figure 10-2 Ground Continuity Test
Содержание LOGIQ V5
Страница 1: ...GE LOGIQ V5 LOGIQ V3 Basic Service Manual Part Number 5496012 100 Revision 3...
Страница 2: ......
Страница 11: ...GE LOGIQ V5 LOGIQ V3 DIRECTION 5496012 100 REVISION 3 BASIC SERVICE MANUAL ix ZH CN KO...
Страница 27: ......
Страница 116: ...GE LOGIQ V5 LOGIQ V3 DIRECTION 5496012 100 REVISION 3 BASIC SERVICE MANUAL 4 34 Section 4 5 Peripheral Checks...
Страница 145: ......
Страница 169: ......
Страница 170: ...2014 General Electric Company GE GEMedical Systems Ultrasound 9900 Innovation Drive Wawautosa Wisconsin 53226 USA...