GE
LOGIQ V5/LOGIQ V3
D
IRECTION
5496012-100, R
EVISION
3
B
ASIC
S
ERVICE
M
ANUAL
Chapter 4 - Functional Checks
4 - 3
4-3-2
Power Off/ Shutdown
NOTE:
After turning off a system, wait at least ten seconds before turning it on again. The system may not be
able to boot if power is recycled too quickly.
4-3-2-1
Back-end Processor Power Down
To power down the system:
1.) Press the
Power On/Off
switch at the front of the system once.
2.) The System-Exit window is displayed.
3.) Using the Set
key, select Shutdown.
4.) The shutdown process takes a few seconds and the power off sequence is complete when the
power status LED is turned blue.
5.) Disconnect the probes. Clean or disinfect all probes as necessary. Store them in their shipping
cases to avoid damage.
4-3-2-2
Scanner Shutdown
Disconnect the Mains Power Cable is necessary.
For example:
Relocating the scanner.
Figure 4-2 System-Exit Window
CAUTION
DO NOT unplug and/or transport the unit until after the power off sequence has been completed.
Failure to do so may result in corrupted patient files.
Содержание LOGIQ V5
Страница 1: ...GE LOGIQ V5 LOGIQ V3 Basic Service Manual Part Number 5496012 100 Revision 3...
Страница 2: ......
Страница 11: ...GE LOGIQ V5 LOGIQ V3 DIRECTION 5496012 100 REVISION 3 BASIC SERVICE MANUAL ix ZH CN KO...
Страница 27: ......
Страница 116: ...GE LOGIQ V5 LOGIQ V3 DIRECTION 5496012 100 REVISION 3 BASIC SERVICE MANUAL 4 34 Section 4 5 Peripheral Checks...
Страница 145: ......
Страница 169: ......
Страница 170: ...2014 General Electric Company GE GEMedical Systems Ultrasound 9900 Innovation Drive Wawautosa Wisconsin 53226 USA...