26
Reactor/Choke
Disconnect all leads to the reactor.
Remove the two mounting bolts and lift out.
Set new reactor on SCR base and start screws back into base. Be sure to use the original
screws and washers. run screws in to base finger tight.
Check that the bottom of the reactor is flat against the base.
Alternately tighten the two screws by 1/4 turn until firm.
Replace all connections removed in step 1.
Содержание EV100 LX
Страница 3: ...3 EV100LX COMPONENT LOCATIONS ...
Страница 4: ...4 EV100LX OUTLINE DRAWING ...
Страница 5: ...5 EV100LX WITH SPEED LIMIT AND FW 9 ...
Страница 6: ...6 EV100LX WITH REGEN AND FW 9 ...
Страница 7: ...7 EV100LX DUAL MOTOR CONTROL 9 ...
Страница 8: ...8 EV100LX PUMP CONTROL 9 ...
Страница 10: ...10 EV100LX PART NUMBER IDENTIFICATION ...
Страница 60: ...6 0 ...
Страница 80: ...g GE Industrial Systems EV200LX SUPPLEMENT Page 4 of 5 REV 11 2002 Wiring Diagram ...