User Manual
Druck DPI620 Genii
To configure leak test:
1.
Set the Utility to Leak Test.
2.
Select:
SETTINGS
>> LEAK TEST
3.
Set the following periods
WAIT TIME
:
The time before the test starts in
hours:minutes:seconds (hh:mm:ss).
TEST TIME
:
The period of the leak test in
hours:minutes:seconds (hh:mm:ss)
4.
Use to start the Leak Test
5.
Use to stop the “Ramp” cycle
Note
: To set the Leak Test options, a pressure module must
be correctly installed.
06 June 2013
K0541 issue 1
Page 72 of 175