User Manual
Druck DPI620 Genii
Run Procedure
5.4
The purpose of the Run procedure is to do calibration
procedures which have been downloaded from 4 Sight
software. The 4 Sight calibration procedure contains all
the values to calibrate a device under test (test points,
ramp time).
The same calibration procedure can be used for all the
applicable devices under test. To use the Run Procedure
function, the following items are required:
•
A copy of the 4 Sight Calibration Software.
•
Standard USB lead (as supplied).
A Druck DPI 620 Genii calibrator device driver available
as a download from the website www.ge-mcs.com.
06 June 2013
K0541 issue 1
Page 90 of 175