Druck ADTS 2XX User Manual
12
K0451 Issue No. 1
3-2 Power-up routine
{
Set the power supply switch to ON.
{
Check that the screen shows the correct display for a successful power-up.
Check:
{
the pump operates.
{
the power indicator lights
{
air discharges through the water drain.
{
Connect the cable to the AHT communication connector on the ADTS 2XX.
{
Check that the screen shows the correct display.
{
Check that the ADTS 2XX screens show the correct display messages (see below).
Note:
This Windows
®
based facility hides many of the normal features of Windows
®
.
F
IGURE
3-1 P
OWER
-
UP
D
ISPLAYS
DRUCK ADTS 2XX
DRUCK ADTS 2XX
Three Channel
Air Data Test System
Main Menu Screen
Front panel or advanced hand terminal screen
Содержание Druck ADTS 2 Series
Страница 1: ...GE Sensing Druck Air Data Test Systems Three channel Test Set User Manual K0451 XX ...
Страница 2: ... General Electric Company All rights reserved ...
Страница 56: ...Druck ADTS 2XX User Manual 44 K0451 Issue No 1 INTENTIONALLY LEFT BLANK ...
Страница 66: ...Druck ADTS 2XX User Manual 54 K0451 Issue No 1 INTENTIONALLY LEFT BLANK ...