GE Energy
D20/D200
Installation and Operations Guide
General 994-0078-2.00-7
Full
97
Power-up and Test
, continued
Procedure
Follow these steps to check that switch-over is functioning correctly for the event of
software failure:
Step
Action
1
On the front of the RS-232 Panel, check that
CCU A
LED is
illuminated, which shows that CCU A is Active.
Note: Both
the
PWR A
and
PWR B
LEDs should be illuminated.
2
Connect a WESMAINT cable to the female DB-9 WESMAINT II+ port
on the front panel of the CCU
A
D20ME/ME II Active board.
3
Attach the other end of the WESMAINT II+ cable to the serial
communications port of the PC or terminal.
4
Login to WESMAINT on CCU A using your the emulator.
Result: The WESMAINT
Main Menu
is displayed.
5
Select
System Functions
on the Main Menu and press
ENTER
.
Result: The WESMAINT
Function Menu
is displayed.
6
Select
SWITCH-OVER
on the Function Menu and press
ENTER
.
Result: A password prompt is displayed.
7
Enter your password and press
ENTER
. The default is “control”.
Result: The
CCU
Switch-Over
display shows: “
choose switch-over
(<ctrl>-V) to begin
”.
8
Press
CTRL-V
.
Result:
A confirmation message shows: “
Confirm Yes/No
”.
9
Type
Yes
and press
ENTER
.
Result: Fail over occurs
10
Verify the switch-over: see “Procedure”, page 98.
Содержание D20
Страница 1: ...GE Energy D20 D200 Installation and Operations Guide 994 0078 Version 2 00 Revision 7 General ...
Страница 132: ......