D20/D200
Installation and Operations Guide
GE Energy
994-0078-2.00-7 General
112
Full
D20/D200 Software Configuration
, continued
Software Configuration – D20ME II
, continued
Procedure:
D20ME II -
CCU
The following steps demonstrate the serial download of a Flash code file to a
CCU
type of D20ME II module using the 68K Monitor.
Step
Action
D20ME II - CCU Code Download
1
Restart the D20ME II, again.
2
As soon as messages display on the monitor, press the
SPACEBAR
key
within 5 seconds.
Result: A message displays, asking if you wish to abort the Flash
boot.
3
Type
y
.
4
Press
ENTER
. In the login dialog, type
westronic
and press
ENTER
, then
type
rd
and press
ENTER
.
Result: After a Welcome message, the D20MES> prompt displays.
5
Type
sp
to suspend all processes running on the D20ME II.
6
Type
erase
to clear the Flash. This will take several seconds.
Result: The monitor displays the messages below and then returns the
D20MES> prompt:
Erasing FLASH memory <
\ Checking FLASH contents... \
Optional Step 1: To speed-up communication to shorten download time
7
Type
Baud 38400
and press
ENTER
(speeds up to 230.4 Kbps, or lower
speeds may be chosen based on ambient EMI, cable length, PC limits
etc.)
Result: The communication speed of the 68K Monitor is set to 38.4
Kbps.
Содержание D20
Страница 1: ...GE Energy D20 D200 Installation and Operations Guide 994 0078 Version 2 00 Revision 7 General ...
Страница 132: ......