![GE D20 Скачать руководство пользователя страница 55](http://html.mh-extra.com/html/ge/d20/d20_installation-and-operation-manual_132787055.webp)
GE Energy
D20/D200
Installation and Operations Guide
General 994-0078-2.00-7
Full
53
Connections and Configuration
, continued
Termination
Panels: Jumper
Settings
There are three WESTERM Termination Panels. For jumper configuration settings
for each of these boards see the Module Layout drawings:
•
WESTERM D20M+ SS for non-VME see
517-0224-ML
•
WESTERM D20M+ for VME see
517-0225-ML
•
WESTERM D20M++ for VME see
517-0245-ML
Termination
Panels: Power
Supply
Power connections to the WESTERM Termination Panels are made on connector
blocks:
•
TB1 on the WESTERM D20M+ SS and WESTERM D20M+
•
TB2 on the WESTERM D20M++
WESTERM
D20M+SS:
Power Supply
Power Supply connections on WESTERM D20M+ SS and WESTERM D20M+:
•
1 & 2 are used for input power connections based on the WESDAC D20 Power
Supply
•
4 & 5 can be used as a switched auxiliary power supply source
•
7 & 8 can be used externally for status wetting, contact wetting and/or
miscellaneous power connections, if applicable.
Содержание D20
Страница 1: ...GE Energy D20 D200 Installation and Operations Guide 994 0078 Version 2 00 Revision 7 General ...
Страница 132: ......