![GE D20 Скачать руководство пользователя страница 60](http://html.mh-extra.com/html/ge/d20/d20_installation-and-operation-manual_132787060.webp)
D20/D200
Installation and Operations Guide
GE Energy
994-0078-2.00-7 General
58
Full
Connections and Configuration
, continued
WESTERM
D20C: External
DC & Control
Output Supply
For connections to the WESTERM D20C for status input wetting, use TB1-1 and
TB1-51. TB1-2 is for either a connection accepting an external positive supply for
control outputs or as an output connection for sourcing the internal control output
common:
Jumpers Z2 and Z3 must be set for external supply source. Jumpers Z4 and Z17 must
be set for TB-2: for either and external (+) polarity supply for control outputs to
interposing relays or for outputting the internal supply common (-).
Since bipolar status inputs are allowed, the polarity of the external supply is
irrelevant. Fuses F2 and F3 provide fusing on each leg of the supply.
See “WESTERM D20C: Jumpers”, page 71.
Содержание D20
Страница 1: ...GE Energy D20 D200 Installation and Operations Guide 994 0078 Version 2 00 Revision 7 General ...
Страница 132: ......