background image

9100c

3-2

M1207026

WARNING

After any repair or service of the 9100c system, complete 
all tests in this section.

Before you do the tests in this section:

Complete all necessary calibrations and subassembly 
tests. Refer to the individual procedures for a list of 
necessary calibrations.

Completely reassemble the system.

If a test failure occurs, make appropriate repairs and test 
for correct operation.

M1207027

004

MANUAL−DOC, Technical Reference Manual, Technical Reference Manual for 9100c, English−default

Reproduced from the electronic master in MATRIX

Содержание 9100c

Страница 1: ...Technical Reference Manual Software Revision 1 x M1207027 004 MANUAL DOC Technical Reference Manual Technical Reference Manual for 9100c English Reproduced from the electronic master in MATRIX Approv...

Страница 2: ...M1207027 004 MANUAL DOC Technical Reference Manual Technical Reference Manual for 9100c English Reproduced from the electronic master in MATRIX...

Страница 3: ...ers This document is not to be reproduced in any manner nor are the contents to be disclosed to anyone without the express authorization of the product service department Datex Ohmeda Ohmeda Drive PO...

Страница 4: ...ho jazyka kolem z kazn ka Nesna te se o dr bu tohoto za zen ani byste si p e etli tento provozn n vod a pochopili jeho obsah V p pad nedodr ov n t to v strahy m e doj t k poran n pracovn ka prodejn h...

Страница 5: ...ugih rizika EL ATENCION ES Este manual de servicio s lo existe en ingl s Si el encargado de mantenimiento de un cliente necesita un idioma que no sea el ingl s el cliente deber encargarse de la traduc...

Страница 6: ...r chez le technicien l op rateur ou le patient des blessures dues des dangers lectriques m caniques ou autres FIGYELMEZTET S HU Ezen karbantart si k zik nyv kiz r lag angol nyelven rhet el Ha a vev sz...

Страница 7: ...l kalba Jei kliento paslaug tiek jas reikalauja vadovo kita kalba ne angl suteikti vertimo paslaugas privalo klientas Nem ginkite atlikti rangos technin s prie i ros jei neperskait te ar nesupratote i...

Страница 8: ...r andre farer OSTRZE ENIE PL Niniejszy podr cznik serwisowy dost pny jest jedynie w j zyku angielskim Je li serwisant klienta wymaga j zyka innego ni angielski zapewnienie us ugi t umaczenia jest obow...

Страница 9: ...furnizeze o traducere Nu ncerca i s repara i echipamentul dec t ulterior consult rii i n elegerii acestui manual de service Ignorarea acestui avertisment ar putea duce la r nirea depanatorului operato...

Страница 10: ...r F rs k inte utf ra service p utrustningen om du inte har l st och f rst r den h r servicehandboken Om du inte tar h nsyn till den h r varningen kan det resultera i skador p serviceteknikern operat r...

Страница 11: ...different or additional procedures or requirements This manual is subject to periodic review update and revision Customers are cautioned to obtain and consult the latest revision before undertaking a...

Страница 12: ...9100c x M1207026 M1207027 004 MANUAL DOC Technical Reference Manual Technical Reference Manual for 9100c English Reproduced from the electronic master in MATRIX...

Страница 13: ...nce Manual 1 3 1 2 2 Software versions 1 3 1 2 3 Ventilator tests 1 3 1 3 Overview 1 4 1 4 Configuration options 1 5 1 4 1 Standard configuration 1 5 1 4 2 Options 1 5 1 5 System components 1 6 1 6 Sy...

Страница 14: ...Electronic and electrical components 2 20 2 7 1 9100c ventilator functional blocks 2 20 2 7 2 Power supply 2 20 2 7 3 Sealed Lead Acid Battery 2 21 2 7 4 System switch 2 21 2 7 5 Control Sample Board...

Страница 15: ...test 3 15 3 10 Alarm tests 3 17 3 11 Breathing system tests 3 19 3 12 Power failure test 3 20 3 13 Electrical safety tests 3 23 4 Service Tests and Service Mode 4 1 Self tests 4 3 4 2 Service Mode 4 4...

Страница 16: ...1 Testing Adjusting Low pressure Regulators 5 6 5 3 Hypoxic Guard 5 7 5 4 Airway Pressure Gauge 5 8 5 4 1 Zero the pressure gauge 5 8 5 4 2 Checking the pressure gauge accuracy 5 9 6 Installation and...

Страница 17: ...per rear panels 9 5 9 2 2 To remove the lower access panel 9 6 9 3 How to remove the tabletop 9 7 9 4 How to remove the upper shelf 9 8 9 5 Service the pipeline inlet manifold components 9 9 9 5 1 Rep...

Страница 18: ...9 25 9 12 2 Replace Bag Vent switch assembly 9 26 9 12 3 Replace the Bag port 9 27 9 12 4 Replace the disc seat of inspiratory expiratory check valves 9 28 9 12 5 EZchange Canister spring replacement...

Страница 19: ...4 2 Breathing system rear view 10 20 10 14 3 APL Valve 10 21 10 14 4 Bag Vent Switch 10 22 10 14 5 Absorber canister 10 23 10 14 6 Shelf canister interface 10 24 10 14 7 Exhalation Valve 10 25 10 14 8...

Страница 20: ...AGSS 10 40 10 21 CGO Valve AGSS Installation AGSS Flowtube 10 42 11 Schematics and Diagrams M1207027 004 MANUAL DOC Technical Reference Manual Technical Reference Manual for 9100c English Reproduced f...

Страница 21: ...er s Reference Manual 1 3 1 2 2 Software versions 1 3 1 2 3 Ventilator tests 1 3 1 3 Overview 1 4 1 4 Configuration options 1 5 1 4 1 Standard configuration 1 5 1 4 2 Options 1 5 1 5 System components...

Страница 22: ...Ventilator components Gas delivery components Breathing system components Frame components Other equipment Other equipment may be attached to the system mounting arm or the top shelf Consult separate...

Страница 23: ...ration functions let GE Healthcare trained users and GE Healthcare service personnel perform most ventilator setup functions tests calibration and measurements from the front panel display Normal oper...

Страница 24: ...olled ventilator with internal monitors electronic PEEP Volume Control Mode Pressure Control Mode and other optional features Note Configurations available for this product depend on local market and...

Страница 25: ...ected software features O2 monitoring Auxiliary Common Gas Outlet ACGO Pipeline configurations O2 N2O O2 Air or O2 N2O Air Gas cylinder configurations O2 O2 N2O O2 Air O2 O2 O2 O2 N2O O2 O2 Air O2 N2O...

Страница 26: ...pressure gauge 7 System switch 8 Caster with brake 9 O2 flush button 10 ACGO switch option 11 ACGO option 12 Breathing system 13 Flow controls 14 Mounting arm option Figure 1 1 Front View 2 1 9 13 14...

Страница 27: ...3 Equipotential stud 4 Cylinder inlet option 5 Pipeline inlet 6 Mains supply inlet 7 System circuit breaker Figure 1 2 Rear view 1 2 5 3 4 7 6 M1207027 004 MANUAL DOC Technical Reference Manual Techni...

Страница 28: ...can cause damage to the equipment Read and follow all warnings and cautions On power Off power On system on O2 O2 flush button Off system standby ACGO AC on and battery charging Battery on Dangerous v...

Страница 29: ...ansformer Low pressure leak test 134 C Autoclavable Not autoclavable Bellows volumes are approximate O2 O2 cell connection APL settings are approximate Anesthetic Gas Scavenging System Pinch hazard Re...

Страница 30: ...Manufacturer name and address Date of manufacture Indicates that the waste of electrical and electronic equipment must not be disposed as unsorted municipal waste and must be collected separately Ple...

Страница 31: ...n 2 9 2 3 3 Mechanical ventilation 2 11 2 4 General Description 2 14 2 5 9100c Ventilator features 2 15 2 5 1 Safety features 2 15 2 6 9100c Ventilator components 2 16 2 6 1 Display Module 2 17 2 6 2...

Страница 32: ...ressure Regulator 2 25 2 8 3 Inspiratory flow control valve 2 25 2 8 4 Exhalation PEEP Control 2 25 2 8 5 Reservoir and bleed resistor 2 26 2 8 6 Bellows pressure relief valve 2 26 2 8 7 Mechanical Ov...

Страница 33: ...e The flow of gas through the breathing system Electrical signals between the anesthesia machine including the breathing system and the ventilator Ventilator mechanical subsystems M1207027 004 MANUAL...

Страница 34: ...e flow control valve An electrical switch monitors the O2 supply pressure If the pressure is too low an alarm appears on the ventilator display Air and N2O Flow A balance regulator controls the flow o...

Страница 35: ...w sensor 13 Gas throttles 41 Patient lung 14 Flowmeter module 42 Negative pressure relief valve 15 O2 flush 43 Absorber canister 16 Vaporizer manifold 44 BTV switch 17 37 9 kPa relief valve 45 Bag 18...

Страница 36: ...300 100 200 150 100 50 psi kPa x 725 1450 2175 2900 300 100 200 150 100 50 psi kPa x 725 1450 2175 2900 N20 AIR 02 AIR N20 02 3 4 5 6 8 43 58 73 87 kPa x 100 3 4 5 6 8 43 58 73 87 kPa x 100 3 4 5 6 8...

Страница 37: ...ease in N2O flow Higher concentrations of O2 are possible when the hypoxic guard is not engaged either by reducing the N2O flow below the point of engagement or by increasing O2 flow above the point o...

Страница 38: ...as paths Common gas can flow from the machine interface directly to the patient through the inspiratory check valve or through the absorber into the expiratory flow Scavenged gas paths APL or pop off...

Страница 39: ...breathing circuit module through the absorber and through a unidirectional valve inspiratory check valve to the patient During inspiration common gas flows from the machine into the inspiratory limb u...

Страница 40: ...stream of the expiration check valve APL Valve The APL valve sets a pressure limit for manual ventilation As you turn the APL knob it puts more or less force on the APL disc and seat As circuit pressu...

Страница 41: ...s Gas flows from inside the corrugated bellows through the absorber where the CO2 is removed through a unidirectional valve inspiratory check valve to the patient During inspiration common gas flows i...

Страница 42: ...flows out of the bellows to the scavenging system If PEEP is selected static pressure on the pilot port of the exhalation valve sets the PEEP level During exhalation common gas flows backwards through...

Страница 43: ...s pushed down on the bellows Gas flows from the bellows through the EZchange module bypassing the absorber and through a unidirectional valve inspiratory check valve to the patient During inspiration...

Страница 44: ...s for airway pressure and exhaled volume The ventilator is designed to be used as a medical device assisting in the delivery of anesthesia and is part of the 9100c Anesthesia Machine Figure 2 3 9100c...

Страница 45: ...management etc Ventilator hardware is regularly monitored by software tests An exhalation valve modulates flow in the pressure control mode Pressure and volume control modes are selectable by the ope...

Страница 46: ...f 1 Display Module The Display Module includes Display Monitor Board LCD Display Keyboard with rotary encoder switch 2 Control Sample Board under tabletop 3 Vent Engine under tabletop Figure 2 4 Locat...

Страница 47: ...nverter 2 Display Monitor Board DMB 3 Speaker 4 LCD display 5 Keyboard front panel 6 Rotary encoder Figure 2 5 9100c Display Module 1 2 3 4 5 6 M1207027 004 MANUAL DOC Technical Reference Manual Techn...

Страница 48: ...ontrol Sample Board The Control Sample Board CSB is located underneath the tabletop M1207027 004 MANUAL DOC Technical Reference Manual Technical Reference Manual for 9100c English Reproduced from the...

Страница 49: ...ellows It includes 2 micron inlet filter Pressure regulator Inspiratory flow valve Mechanical overpressure relief valve Free breathing check valve PEEP safety valve Supply pressure sense switch PEEP c...

Страница 50: ...l ventilation and monitoring parameters and a keyboard for operator input Display Monitor Board with digital and power circuits to manage all operations of the ventilator 2 7 2 Power supply The power...

Страница 51: ...fused auto resettable Input Normally 15 VDC at 25 C during charge Output 0 3 to 2 Amps during discharge 2 7 4 System switch The system switch has two positions On and Standby In the Standby position...

Страница 52: ...og circuits Digital circuits The Control Sample Board s functions include Voltage regulation Switch interface RS232C serial I O Oxygen sensor interface Patient airway transducer Flow transducer Flow v...

Страница 53: ...sor Voltage regulators RS232C serial I O Clocks and timers for the system System On Standby Battery monitor and protect circuits Power supply monitor System memory Front panel interfaces Rotary encode...

Страница 54: ...gas inlet filter 3 Inspiratory flow control valve 4 Mechanical Overpressure Valve MOPV 5 Free breathing valve 6 Reservoir and bleed resistor 7 PEEP control valve 8 PEEP safety valve 9 Supply pressure...

Страница 55: ...Control The exhalation valve contains an elastomeric diaphragm that is used to control the pressures in the breathing circuit The exhalation valve includes one male port on the bottom for Exhalation...

Страница 56: ...nrichment 2 8 6 Bellows pressure relief valve The Bellows assembly is the interface between drive gas and the patient circuit in the breathing system The pressure relief valve or pop off valve 12 in t...

Страница 57: ...e breathing valve permits the patient to inhale The free breathing valve is closed on mechanical inspiration 2 8 9 Breathing Circuit Flow Sensor The flow sensor 14 is installed at the patient s Y piec...

Страница 58: ...9100c 2 28 M1207026 M1207027 004 MANUAL DOC Technical Reference Manual Technical Reference Manual for 9100c English Reproduced from the electronic master in MATRIX...

Страница 59: ...6 O2 supply alarm test 3 10 3 7 Flush flow test 3 11 3 8 Vaporizer back pressure test 3 12 3 9 Low pressure leak test 3 13 3 9 1 Negative low pressure leak test 3 13 3 9 2 Positive low pressure leak...

Страница 60: ...ary calibrations and subassembly tests Refer to the individual procedures for a list of necessary calibrations Completely reassemble the system If a test failure occurs make appropriate repairs and te...

Страница 61: ...O2 Cell calibration Paw Zero Paw Gain PEEP Valve Flow Zero Inspiratory Flow Valve Flow Sensor Negative Flow Sensor Positive Then complete the checkout procedure for the entire machine in the followin...

Страница 62: ...t is correctly connected not damaged Pipeline gas supplies are connected Cylinder valves are closed Models with cylinder supplies have a cylinder wrench attached to the system Models with cylinder sup...

Страница 63: ...plicable cylinder valve and install a full cylinder 4 Set the system switch to Standby 5 Test one cylinder at a time for high pressure leaks Turn the flow control knobs fully clockwise to stop gas flo...

Страница 64: ...ch to On and set the Bag Vent switch to Bag 6 Adjust O2 flow to 0 5 L min 7 Confirm that the O2 sensor measures 21 in room air and 100 in pure O2 If not calibrate the O2 sensor 8 Set the flow controls...

Страница 65: ...alfunction of the Link system but it will not confirm proper calibration Nitrous oxide N2O flows through the system during this test Use a safe and approved procedure to collect and remove it 1 Set up...

Страница 66: ...continuing the test 9 Check the proportioning system concentration decreasing O2 flow Observe the following precautions Set the N2O flow to 9 0 L min Set the O2 flow to 3 0 L min or higher While redu...

Страница 67: ...mmon gas outlet 5 Connect the tubing from test adapter to a digital manometer 6 Adjust the O2 flow to 0 5 L min 7 Verify that the test device reading stabilizes within the following range 31 60 kPa 23...

Страница 68: ...O if equipped and O2 flows stop The O2 flow stops last Air if equipped flow continues The No drive gas alarm occurs as well on the ventilator if the ventilator uses O2 as the drive gas 5 Turn all of t...

Страница 69: ...the O2 flush button is fully and continuously depressed 6 Repeat the above measurement two more times deflate bellows by removing the plug from the patient port 7 The bellows should fill in approxima...

Страница 70: ...ration for each step from 0 to 1 The O2 flow must not decrease more than 1 L min through the full range If the O2 flow decreases more than 1 L min Install a different vaporizer and try this step again...

Страница 71: ...et the ACGO selector switch to ACGO Turn all flow controls fully clockwise zero flow Do not overtighten Connect the leak test device to the ACGO outlet Compress and release the bulb until it is empty...

Страница 72: ...zero flow Do not overtighten Connect the test adapter port 1 to the common gas outlet Connect the leak test device to the test adapter port 2 Compress and release the bulb until it is empty The vacuu...

Страница 73: ...ak test at the common gas outlet only With ACGO 1 Set the ACGO selector switch to ACGO 2 Turn all flow controls fully clockwise closed 3 Using the positive pressure leak test adapter connect the posit...

Страница 74: ...the vaporizer to 1 Repeat steps 5 through 10 Turn the vaporizer Off 12 Remove test tool 13 Replace the breathing system WARNING Agent mixtures from the low pressure leak test stay in the system Always...

Страница 75: ...the flow through the test device is less than 0 35 L min there is a low pressure leak in the anesthesia machine 11 Fully open the needle valve on the test device to decrease the back pressure 12 Test...

Страница 76: ...15 Flush the system with O2 Set the O2 flow to 1 L min Continue the O2 flow for one minute Turn the O2 flow control fully clockwise closed M1207027 004 MANUAL DOC Technical Reference Manual Technical...

Страница 77: ...ntrol to 5 L min 8 Make sure that The end expiratory pressure is approximately 2 cm H2O Note Positive end expiratory pressure when PEEP is off may indicate that the scavenging system is not removing e...

Страница 78: ...lude O2 monitor skip step 13 and 14 13 Test the O2 monitor and alarms Remove the O2 sensor from the breathing system Make sure the sensor measures approximately 21 O2 in room air Set the low O2 alarm...

Страница 79: ...reathing circuit at the patient connection Push the O2 flush button to fill the bellows The pressure must not increase to more than 15 cm H2O on the pressure gauge If the bellows falls more than 150 m...

Страница 80: ...e inspiratory pressure gauge is less than approximately 5 cm H2O Push the O2 flush button Make sure that the value on the inspiratory pressure gauge stays less than 10 cm H2O Set the O2 flow to zero a...

Страница 81: ...hine reset circuit breaker Check the AC inlet assembly 2 Set the system switch to On 3 Unplug the power cord with the system turned on 4 Make sure that the power failure alarm comes on 5 Make sure the...

Страница 82: ...or AAMI and verify that the leakage current is less than 2 Make sure that the resistance to ground is less than 0 2 between an exposed metal surface and the ground pin on the power cord Voltage Max Le...

Страница 83: ...of menu pages that a qualified service person can use to test calibrate or troubleshoot ventilator related components in the 9100c anesthesia machine Service Mode 4 1 Self tests 4 3 4 2 Service Mode...

Страница 84: ...Sensor Positive 4 22 4 5 8 Flow Sensor Negative 4 24 4 5 9 Calibration Coefficient 4 25 4 6 Configuration Upgrade 4 26 4 6 1 Function Upgrade 4 26 4 6 2 Software Upgrade 4 27 4 6 3 Language 4 28 4 6 4...

Страница 85: ...EEP and flow valve If one or more of these tests fail the display provides a readout of the problem Continuous tests These tests are run continuously during normal operation and alarms are associated...

Страница 86: ...hen push the adjustment knob to confirm the selection From this menu you can Go to the Service Mode Return to Normal Mode Service Mode Menu The Service Mode main menu displays the non selectable venti...

Страница 87: ...urrent software loaded into the ventilator and displays the system time The Software Version includes CSB Version DMB Version Alarm Version The System Time displays the time set in the ventilator scre...

Страница 88: ...stic Tests Tools menu includes a selection of items that look at individual subsystems of the 9100c Ventilator M1207027 004 MANUAL DOC Technical Reference Manual Technical Reference Manual for 9100c E...

Страница 89: ...s are electronic Mechanical switches ACGO Switch Vent or Aux CGO machine equipped with ACGO Canister Status Closed or Open Closed by default if Canister Release switch not installed Bag Vent Status Ve...

Страница 90: ...plays the battery charge status Battery Status Battery Charging Battery is charging Battery is ON Power is OK System is running on battery M1207027 004 MANUAL DOC Technical Reference Manual Technical...

Страница 91: ...hould disappear As you turn the encoder knob verify that each click of the encoder in the clockwise direction increments the clockwise total The total number is 30 each click of the encoder in the cou...

Страница 92: ...or Fail DMB 3 3 V voltage Pass or Fail PEEP Valve DAC Pass or Fail Inspiratory Flow valve voltage Pass or Fail PEEP Valve Drive Pass or Fail 10 VA of PEEP and Flow Valve Pass or Fail When the result i...

Страница 93: ...f valve test It is used to check primary regulators as detailed in Section 5 1 2 Note The Inspiratory Flow Valve Calibration and PEEP Valve Calibration should be performed before you Set Inspiratory F...

Страница 94: ...the breathing system for leaks Note The Inspiratory Flow Valve Calibration and PEEP Valve Calibration should be performed before you do the Breathing System Leak Test Note The regarding plug is locate...

Страница 95: ...to maintain specified accuracy Remarks These procedures require you to disassemble and reassemble parts of the breathing system Accordingly the procedures are arranged to minimize the disassembly and...

Страница 96: ...If the calibration passes the calibration value can be stored in the EEPROM If the calibration value is not within the correct tolerance the calibration fails Remarks Ensure that the breathing system...

Страница 97: ...onnect the calibration fitting See Section 10 1 2 to the patient circuit Y piece 6 Connect the tube from the calibration fitting to pressure test device 7 Adjust the APL setting to achieve a stable pr...

Страница 98: ...nce the calibration fails If the calibration passes the A D value can be stored in the EEPROM The sensor must be calibrated at 21 O2 before calibration at 100 O2 Remarks Remove the O2 sensor from the...

Страница 99: ...nect the calibration fixture A to the drive gas outlet 3 Connect the flow sensor B to the calibration fixture 4 Connect the calibration pipe C to the flow sensor 5 Connect a manual bag D to the bag po...

Страница 100: ...routine opens the PEEP valve stepwise and reads the resulting airway pressure The accumulated values represent the output linearity curve for this particular PEEP valve The accumulated data includes...

Страница 101: ...e If the calibration passes the offset and zero values are stored in the EEPROM If the value is not within the correct tolerance the calibration fails Remarks Ensure that the flow sensor tubes are dis...

Страница 102: ...tion Calibration Setup 1 Remove the bellows assembly then connect the calibration fixture A to the drive gas outlet 2 Connect the large port of flow sensor B to the calibration fixture 3 Connect the c...

Страница 103: ...atory valve stepwise and reads the resulting pressure at the airway pressure transducer The inspiratory flow displayed on the screen for this test is a calculation of the pressure measured by the airw...

Страница 104: ...ifice before the Flow Sensor Positive Calibration Calibration Setup 1 Remove the bellows assembly connect the calibration fixture A to the drive gas outlet 2 Connect the large port of flow sensor B to...

Страница 105: ...s detailed in the calibration setup The small port is the port closest to the patient connection The large port is the port closest to the patient circuit Y piece Section 2 8 9 The data is stored in E...

Страница 106: ...up To perform the flow sensor negative calibration connect the calibration tools as in the Flow Sensor Positive calibration but reverse the direction of the flow sensor by connecting the small port to...

Страница 107: ...Calibration Before the Flow Sensor Negative Calibration Remarks The Calibration Coefficient is marked on the calibration orifice The data is stored in EEPROM and is used during the calibration to com...

Страница 108: ...ach digit in each Entry field and rotate the control knob to select the corresponding digit in the Key Code When you have entered all the digits select Save New Key After verifying the Key Code match...

Страница 109: ...re the USB disk is inserted during the upgrade If the USB disk is removed during the upgrade that may result in the failure of the display monitor board Remarks Ensure the AC power is ON during the up...

Страница 110: ...u is used to set the specific language for normal operation The 9100c ventilator supports the following languages The language selections appear in language specific text Chinese English Russian Korea...

Страница 111: ...sensitive To ensure the specified accuracy the altitude setting should be set to the specific altitude where each machine is located Altitude settings range from 400 to 3600 meters in increments of 10...

Страница 112: ...9100c 4 30 M1207026 M1207027 004 MANUAL DOC Technical Reference Manual Technical Reference Manual for 9100c English Reproduced from the electronic master in MATRIX...

Страница 113: ...Regulators 5 2 5 1 1 Test setup 5 2 5 1 2 Test Cylinder Regulators 5 3 5 1 3 Adjusting Cylinder Regulators 5 5 5 2 Low pressure Regulators 5 6 5 2 1 Testing Adjusting Low pressure Regulators 5 6 5 3...

Страница 114: ...t port CAUTION Be careful not to plug the output of the cylinder regulator without having a pressure relief valve in the output circuit 1 Set the system switch to Standby 2 Disconnect all pipeline sup...

Страница 115: ...f the test device pressure does not stabilize within one minute replace the cylinder supply If the test device pressure stabilizes within one minute ut the readings are not within specifications readj...

Страница 116: ...s or O2 flow to 0 1 L min Close the cylinder valve and allow the pressure to decay to 2068 kPa 300 psi as indicated on the cylinder gauge upper limit of the red band The flow may be temporarily increa...

Страница 117: ...ing adjusted is N2O connect a source of O2 and set the O2 flow control to the minimum stop pilot pressure for low pressure regulator To adjust the cylinder regulators follow the procedure in Section 5...

Страница 118: ...t of the tested regulator is within the range listed in the chart 6 If required adjust the N2O Air and O2 regulators to meet the above specifications 7 Repeat Step 1 4 and 5 to confirm the adjustment...

Страница 119: ...ystem that is not serviceable If the hypoxic guard is out of calibration or is malfunctioning replace the entire flow control assembly M1207027 004 MANUAL DOC Technical Reference Manual Technical Refe...

Страница 120: ...s counterclockwise to remove it 5 Adjust the pressure gauge to zero 6 Plug the patient circuit 7 Press and release the O2 flush button to sweep the needle across the pressure gauge 8 Remove the plug f...

Страница 121: ...control sample board and connect a low pressure test device to the remaining open tube 4 Remove the existing tube to the common gas port and connect a low pressure supply source syringe to the remain...

Страница 122: ...9100c 5 10 M1207026 M1207027 004 MANUAL DOC Technical Reference Manual Technical Reference Manual for 9100c English Reproduced from the electronic master in MATRIX...

Страница 123: ...on 6 1 9100c Installation Checklist 6 2 6 2 9100c Planned Maintenance 6 4 6 2 1 Every twelve 12 months 6 4 6 2 2 Every twenty four 24 months 6 5 6 3 Free breathing valve maintenance 6 6 6 4 Adjust dri...

Страница 124: ...libration coefficient Section 4 5 9 b Paw Zero Section 4 5 1 c Paw Gain Section 4 5 2 d O2 Cell Section 4 5 3 e PEEP Valve Section 4 5 4 f Flow Zero Section 4 5 5 g Inspiratory Flow Valve Section 4 5...

Страница 125: ...Low pressure leak test Section 3 9 i Alarm tests Section 3 10 j Breathing system tests Section 3 11 k Power failure test Section 3 12 l Electrical safety tests Section 3 13 M1207027 004 MANUAL DOC Te...

Страница 126: ...bly Tests Section 9 O2 Sensor Calibration Section 9 Refer to listed sections in this manual Perform the following steps 1 MOPV pressure relief valve test Section 6 5 2 Exhalation valve reilef valve te...

Страница 127: ...r failure test Section 3 12 14 Electrical safety tests Section 3 13 6 2 2 Every twenty four 24 months In addition to the 12 month requirements replace the following parts every 24 months All machine a...

Страница 128: ...4 Pull the tail C of the new free breathing valve flapper through the center of the valve sear until it locks in place 5 Trim the tail flush with outside surface of the valve seat refer to the removed...

Страница 129: ...activate a flow of 15 L min 9 Adjust regulator until pressure test device reads 172 kPa 25 psi 10 Set the system switch to Standby when regulator is adjusted 11 Reassemble exhalation valve and bellow...

Страница 130: ...ter the Service Mode From the Diagnostic Tests Tools menu select Valve Test Tool 2 Select Set Inspiratory Flow Valve and activate a flow of 10 L min 3 Carefully listen for the MOPV relief weight to be...

Страница 131: ...1 minute observe the Patient Airway on the vent display and or airway pressure gauge The pressure should indicate a pressure rise of less than 10 cm H2O Note If the pressure rise is more than 10 cm H...

Страница 132: ...9100c 6 10 M1207026 M1207027 004 MANUAL DOC Technical Reference Manual Technical Reference Manual for 9100c English Reproduced from the electronic master in MATRIX...

Страница 133: ...Breathing System Leak Test Guide 7 4 7 2 1 Breathing system leak test 7 5 7 3 Troubleshooting guide 7 7 7 4 Alarm and Shutdown messages 7 8 M1207027 004 MANUAL DOC Technical Reference Manual Technical...

Страница 134: ...g or damaged Loose fill port Check fill port Tighten if loose Low Pressure Leak with or without vaporizer Leaking port valve on vaporizer manifold Use the Vaporizer Manifold Valve Tester to check for...

Страница 135: ...flowmeter assembly Verify low pressure regulator calibration Replace flow control assembly Unable to begin mechanical ventilation No O2 supply Check O2 supply Defective Manual Mechanical ventilation s...

Страница 136: ...module for damaged seals or misassembly and the seating of the O2 sensor if equipped If you have a larger leak in one area than the other Vent or Bag the leak is most likely NOT in the flow sensor mo...

Страница 137: ...ush the O2 flush button to fill the bellows The pressure must not increase to more than 15 cm H2O on the pressure gauge If the bellows falls more than 150 mL min top of indicator it has a leak Service...

Страница 138: ...imately 5 cm H2O Push the O2 flush button Make sure that the value on the inspiratory pressure gauge stays less than 10 cm H2O Set the O2 flow to minimum and make sure that the value on the inspirator...

Страница 139: ...m switch and the control sample board 1 Cable from J8 of CSB to system switch 2 Cable from CSB to DMB 1 Check jumper cable connection replace cable 2 Check cable connection replace cable Turning the s...

Страница 140: ...eck O2 sensor cable CSB CSB and Alarm MCU Communication Failure Shutdown Ventilator malfunction Ventilate manually Monitoring is not reliable Replace DMB CSB Cable from DMB to CSB CSB and DMB Communic...

Страница 141: ...No drive gas User Alarm Middle The ventilator does not detect supply pressure Manually ventilate the patient Make sure that the appropriate gas supplies O2 or Air are connected and pressurized No O2...

Страница 142: ...e of the control circuit for the PEEP Valve Ventilate manually Replace CSB PEEP Valve Drive Failure Shutdown Indicates a problem with the PEEP Valve or the connections to the PEEP Valve Ventilate manu...

Страница 143: ...oard 8 2 8 1 1 Key BID label Key Code 8 3 8 2 After replacing the DMB Display Module 8 4 8 3 After replacing the CSB 8 5 8 4 Software Installation 8 6 M1207027 004 MANUAL DOC Technical Reference Manua...

Страница 144: ...lude all features that are currently installed and enabled record the current Function Upgrade options installed The Function Upgrade options are presented in all machines PCV Enabled or Disabled ACGO...

Страница 145: ...ite http www docodes com 3 Enter the required information and Submit the Request An e mail with the replacement Display Monitor Board Key Code will be immediately sent to the e mail address provided d...

Страница 146: ...e Key Code to restore the original Function Upgrade options 2 Record the new web site generated Key Code on a sticker 3 Affix the BID label provided in the replacement Display Monitor Board kit or on...

Страница 147: ...riate software revision Section 8 4 using software USB disk that matches the software revision of the replaced Control Sample Board CSB M1207027 004 MANUAL DOC Technical Reference Manual Technical Ref...

Страница 148: ...emove the Software USB disk 7 On the Function Upgrade menu Section 4 6 1 of the Service Mode enter the options Key Code found on the side of the display module to restore the original Upgrade Options...

Страница 149: ...inlet filter 9 9 9 5 2 Replace pipeline inlet check valve 9 9 9 5 3 Replace the inlet manifold 9 10 9 6 Service the cylinder supply modules 9 11 9 6 1 Tightening procedure for high pressure tube fitti...

Страница 150: ...9 25 9 12 1 Replace APL valve 9 25 9 12 2 Replace Bag Vent switch assembly 9 26 9 12 3 Replace the Bag port 9 27 9 12 4 Replace the disc seat of inspiratory expiratory check valves 9 28 9 12 5 EZchan...

Страница 151: ...the ventilator extreme care must be taken to avoid introducing foreign debris particularly metal chips generated by screw threads into the pneumatic flow passages of the ventilator Failure to do so ca...

Страница 152: ...2 is not available open the O2 cylinder valve 2 Turn the flow controls for all gases except O2 at least one turn counterclockwise 3 Make sure that all cylinder and pipeline gauges read zero before pro...

Страница 153: ...2 Ensure that all cylinder and pipeline gauges read zero before proceeding 3 Disconnect all electrical cables 4 To remove the large upper rear panel A fully loosen the eight screws that hold the pane...

Страница 154: ...rom the machine Section 9 1 2 Ensure that all cylinder and pipeline gauges read zero before proceeding 3 If present remove the inboard cylinders 4 To remove the lower access panel fully loosen the six...

Страница 155: ...the periphery of the pan assembly access from below the rim of the tabletop To remove the tabletop 1 Loosen the two screws A 2 Slide the tabletop forward and lift to remove A A M1207027 004 MANUAL DO...

Страница 156: ...ten screws B along the periphery of the pan assembly To remove the upper shelf 1 Loosen the ten screws A 2 Lift the upper shelf A A A A A A A A A A M1207027 004 MANUAL DOC Technical Reference Manual T...

Страница 157: ...manifolds include a drive gas connection at the back of the manifold Remove the drive gas tube or plug to access the check valve 4 From the back of the pipeline manifold use a thin tool to push out t...

Страница 158: ...ansfer the following item to the replacement manifold or install new as required pipeline check valve 1 inlet filter 2 inlet fitting 3 and o ring 4 relief valve 5 5 To reassemble perform the previous...

Страница 159: ...9 6 2 Replace cylinder regulator module complete replacement 1 Bleed all gas pressure from the machine Section 9 1 2 Ensure that all cylinder and pipeline gauges read zero before proceeding 3 Remove...

Страница 160: ...he inlet adapter in the cylinder yoke 7 Perform the checkout procedure Section 3 9 6 4 Replace cylinder check valve The cylinder check valve is not a replaceable item If the check valve is defective y...

Страница 161: ...sh in the knob and turn it counterclockwise 8 Pull the knob and collar out from the front and remove the switch assembly 9 Install the replacement switch assembly Insert the wires in the electrical mo...

Страница 162: ...able to an electrical outlet Set the power switch to On Set the system switch to On Make sure that the display comes On Set the system switch to Standby Make sure that the display turns Off 11 Reinsta...

Страница 163: ...all and the machine close all gas cylinders 4 Attach a gauge to the O2 primary regulator test port On pipeline only machines attach the gauge to a 6 mm O2 port 5 Zero the O2 flow 6 Install an O2 cylin...

Страница 164: ...r module 5 Remove the four mounting screws from the manifold 6 Pull the flowmeter module backward slowly 7 Remove the four screws from the side panels Note Two screws from each side panel 8 To reinsta...

Страница 165: ...hen installing a new valve cartridge assembly into the vaporizer manifold put a light coat of Krytox on the bottom of the cartridge The bottom portion of the cartridge is defined as the brass surface...

Страница 166: ...ster o ring should create a seal with the top of the valve 6 Remove the rear upper panel Section 9 2 7 Remove the inlet tube from the vaporizer manifold 8 Test the negative low pressure leak test devi...

Страница 167: ...he vaporizer manifold 4 Remove the upper rear panel Section 9 2 5 Disconnect the tubing from bottom of the valve block 6 Loosen the two screws to remove the valve block Note The valve body o ring and...

Страница 168: ...ve body port at the back of the manifold 13 Gently install the valve body in the manifold Check that the o ring makes a good seal between the manifold and the valve body Check that the flapper valve m...

Страница 169: ...9 To reassemble perform the previous steps in reverse order 10 Perform the checkout procedure Section 3 9 10 5 Replace vaporizer manifold 1 Bleed all gas pressure from the machine Section 9 1 2 Ensure...

Страница 170: ...switch 6 Set the ACGO selector switch to Breathing System 7 Back out the selector switch mounting screws 6 until the tips are flush with the face of the mounting casting 8 While pushing the selector...

Страница 171: ...the knob actuator Using moderate force press the two assemblies together The knob should rotate to the ACGO position 8 While continuing to force the assemblies together rotate the knob assembly to th...

Страница 172: ...ons or debris Clean with isopropyl alcohol if necessary retest 5 If leak persists replace the flapper Remove the flapper from the check valve disk Clean the new flapper with isopropyl alcohol Apply a...

Страница 173: ...wo thumbscrews that hold the APL to the breathing system 4 Place the new APL valve into position with the setting indicator facing to the front of the machine 5 Reassemble in reverse order 6 Reinstall...

Страница 174: ...out the Bag Vent switch from the manifold 4 Replace the o rings as necessary Lubricate o rings sparingly with Krytox 5 Replace the Bag Vent in reverse order 6 Reinstall the breathing system 7 Perform...

Страница 175: ...from the manifold 4 Replace the o ring as necessary Lubricate the o ring sparingly with Krytox 5 Replace the bag port in reverse order 6 Reinstall the breathing system 7 Perform the checkout procedur...

Страница 176: ...mic disc B 6 Reinstall the transparent covers 7 Perform the checkout procedure Section 3 Check valve test In normal operation observe the check valve whether it can rise and fall normally within trans...

Страница 177: ...Step 3 6 Place the canister latch lever in position Apply Loctite 242 to the threads of the two M3 shoulder screw threads and secure the canister latch level 7 Check the switch actuator lever to ensu...

Страница 178: ...tip the 9100c machine more than 10 degrees from vertical 3 Block the opposite wheels then block up the machine until there is enough room to remove the defective caster To block up the machine tip and...

Страница 179: ...e switch harnesses of the task light circuit board connectors 3 Remove the switch from the top shelf using the small needle nose pliers 4 To replace the switch reassemble in reverse order Connectors S...

Страница 180: ...slightly right to disengage the mounting pins 3 Lower the display face down on the work surface 4 Disconnect the cable replace the display module and reassembly in reverse order 5 To replace the cabl...

Страница 181: ...e the two halves 9 16 1 Open the display module 1 Place the display module face down on a protected surface 2 Loosen the screws C that hold the two enclosures together one in each corner 3 Carefully s...

Страница 182: ...to front panel keyboard refer to Note 2 Remove the five screws F that hold the display monitor board to the front enclosure 3 Carefully lift the display monitor board from the front enclosure Guide t...

Страница 183: ...l keyboard inserts into the ZIF zero insertion force connector type B on the DMB To release the flex cable 3 insert a thin slotted screwdriver at the base of the connector and twist it slightly to pry...

Страница 184: ...inverter to the front enclosure 3 Replace the back light inverter in reverse order To replace the rotary encoder 1 Pull the knob E off the shaft of the encoder F 2 Remove the nut and washer that hold...

Страница 185: ...ning components to the new enclosure speaker encoder inverter 5 Reassemble in reverse order To replace the LCD display 1 Remove the four screws H at each corner of the display mounting bracket that ho...

Страница 186: ...witch 1 PEEP Safety Valve 2 PEEP Control Valve 3 Reservoir 4 Drive Gas Ports 5 MOPV and Free Breathing Valve Seat 6 Inlet Filter located under the gas inlet valve 7 Flow Control Valve 8 Drive Gas Regu...

Страница 187: ...abletop Section 9 3 3 Disconnect the Vent Engine harnesses 4 Disconnect the tube 5 Disconnect the drive gas hose 6 Loosen the four screws to remove the Vent Engine 7 To replace the Vent Engine reassem...

Страница 188: ...s necessary Supply Pressure Switch E Also inspect the o ring that seals it to the manifold Replace as necessary Transfer harness wire to top and middle tabs bottom tab open Reservoir F Inspect the two...

Страница 189: ...ear panel components 10 9 10 7 AC Power components 10 10 10 8 Pipeline inlet fittings 10 12 10 9 Cylinder gas supplies 10 13 10 10 Vaporizer manifold 10 14 10 11 Flowmeter Module 10 15 10 12 Tabletop...

Страница 190: ...Module 10 30 10 16 1 Display components 10 31 10 16 2 Display Keyboard and LCD assembly 10 32 10 17 Legris quick release fittings 10 33 10 18 Tubings 10 34 10 19 Cables and harnesses 10 35 10 19 Cabl...

Страница 191: ...9 1 Low pressure Leak Test Device positive pressure 1001 8976 000 Refer to section 3 9 2 Leakage current test device Refer to section 3 13 Test device capable of measuring 689 kPa 100 psi Refer to sec...

Страница 192: ...1913 1e Test adapter with 1 4 inch tubing M1212246 2 Adapter AGSS M1192895 S 3 Vaporizer manifold valve test tool 1006 3967 000 4 Adapter positive low pressure leak test 1009 3119 000 Not Shown Plug s...

Страница 193: ...c M1187012 S 5 Task light switch Label task light M1170954 S M1172137 S 6 Screw ST4 2x13 GB T845 1985 Fe Ep Ni M1168734 S 2 7 Slide drawer 1009 3084 000 8 Screw M4x8 Nyloc 1009 3183 000 2 9 Sticker sh...

Страница 194: ...gauges and system switch Refer to section 10 5 3 Breathing System Refer to section 10 14 4 Display Module Refer to section 10 16 5 Vaporizer manifold Refer to section 10 10 6 Tabletop pan components R...

Страница 195: ...ts Refer to section 10 7 3 Pipeline inlet fittings Refer to section 10 8 4 Cylinder gas supplies Refer to section 10 9 5 Rear panel components Refer to section 10 6 6 Anesthetic Gas Scavenging System...

Страница 196: ...1009 3080 000 7 Connector 1 8 inch copper tube to 5 16 24 1006 3712 000 8 Label gauge O2 ANSI 1009 3081 000 1009 3199 000 N2O ANSI 1009 3082 000 1009 3201 000 Air ANSI 1009 3083 000 1009 3200 000 O2 I...

Страница 197: ...crew M4x8 M1168645 S 2 7 Wrench holder M1169624 S 8 Wrench Pin Index cylinder with cable and ferrule 0219 3415 800 9 Cable 1010 3049 000 10 Ferrule cylinder wrench cable retainer 1001 3708 000 11 Cove...

Страница 198: ...0 CEE 7 7 Euro CEE 7 4 France BS 546 India and South Africa AS 3112 GB2099 Nema 5 15 NA China 2 1 3 4 5 6 11 M1207027 004 MANUAL DOC Technical Reference Manual Technical Reference Manual for 9100c Eng...

Страница 199: ...le India and South Africa BS 546 1001 3305 000 1006 3555 000 1202 3551 000 1006 4421 000 1006 4422 000 1006 3805 000 6 Circuit Breaker 1A Rocker Circuit Breaker 2A Rocker Circuit Breaker 3A Rocker 100...

Страница 200: ...ntered metal filter M1167401 S O ring M1168797 S 4 Pipeline check valve with o ring M1169175 S 5 Gas Inlet Manifold replacement O2 M1164430 S N2O M1164426 S Air M1195162 S 6 Adapter pressure gauge wit...

Страница 201: ...1001 4075 000 3d Filter sintered bronze 9914 6380 000 3f Retaining ring filter 1001 5954 000 4 Clamp yoke 1001 4076 000 5 Tee handle beige 0219 3372 600 6 Spacer gas block 2 Screw M8 x 25 long socket...

Страница 202: ...1102 3043 000 1102 3016 000 6 Nipple vaporizer port New Style 1006 4215 000 7 Screw M2 5x8 M1168643 S 8 Spring Dzus 1102 3056 000 9 Seat check valve 1006 1352 000 10 O ring 27 1 OD 21 89 mm ID 1006 3...

Страница 203: ...719 S O2 Air four five flowtubes ANSI M1177717 S N2O O2 five flowtubes ANSI M1164287 S Neutral O2 N2O Air five flowtubes Neutral M1169299 S O2 Air four five flowtubes Neutral M1177725 S N2O O2 four fi...

Страница 204: ...rt ACGO body 1009 3096 000 8 Screw M4x30 9211 0640 304 9 Lockwasher M4 9213 0540 003 10 Cap ACGO check valve 1009 3095 000 11 Screw M4x8 9211 1040 069 12 Disk ACGO check valve 1009 3062 000 13 Flapper...

Страница 205: ...guard item 2 1009 3099 000 1a Flush pressure switch 1006 3972 000 1b O ring 1006 3213 000 1c Screws M3x20 0144 2124 201 2 Guard 1009 3140 000 3 Tubing silicone 1009 3164 000 4 Tie wrap 0203 5915 300 M...

Страница 206: ...1009 5586 000 10 Ring retaining 9 53 Shaft Dia Type E SST 1406 3277 000 11 Port sample gas 1407 3318 000 12 Label flow sensor connector M1202930 S 13 Flow sensor connector M1171749 S 14 Frame microsw...

Страница 207: ...transparent M1198736 S 9 O ring 20 ID 23 6 OD M1168789 S 10 Hook M1166917 S 11 Screw M2x8 Hook Install M1168578 S 12 Handle breathing system M1195395 S 13 Screw M3x16 M1208611 S 2 14 Screw M4x16 M116...

Страница 208: ...9 S 7 Weight dead 10 cm H2O breathing system negative relief valve 1407 3406 000 8 Seal breathing system negative relief valve 1407 3407 000 9 Valve Seat breathing system negative relief valve M118782...

Страница 209: ...630 S 4 Cage APL M1205628 S 5 Poppet APL M1192905 S 6 Port APL M1192911 S 7 O ring 31 5 ID 36 8 OD M1198747 S 8 O ring 17 ID 20 6 OD M1198751 S 9 Handspike bolt M1192913 S 2 10 O ring 3 55 ID 7 15 OD...

Страница 210: ...2 5 Shelf BTV M1187369 S 6 Shaft BTV M1187375 S 7 O ring 4 ID 7 6 OD M1198749 S 8 Seal BTV M1187377 S 9 Spring BTV M1187379 S 10 O ring 5 ID 8 6 OD M1198746 S 11 O ring 26 ID 31 OD M1198748 S 2 12 O...

Страница 211: ...of foam does not include absorbent 1407 7004 000 2 Cover assembly CO2 canister 1009 8240 000 3 Foam CO2 canister pack of 40 1407 3201 000 4 O ring 1407 3204 000 5 Canister CO2 with handle 1407 3200 00...

Страница 212: ...ring 15 ID 20 3 OD M1169931 S 4 Release pin M1159525 S 5 O ring 22 ID 30 OD M1169929 S 2 6 Shaft hook 85mm M1165449 S 7 Washer M1168758 S 4 8 Shaft hook 61mm M1165452 S 9 O ring 12 37 ID 17 61 OD M116...

Страница 213: ...ve M1187360 S 6 O ring 22 4 ID 26 OD M1168810 S 7 Screw M4x16 PH PAN HD 9211 0440 163 3 8 O ring 2 9 ID 6 46 OD 1407 3409 000 3 9 Cover exhalation valve M1187363 S 10 O ring 4 47 ID x8 03 OD 1407 3703...

Страница 214: ...ows 1500 3378 000 3 Rim 1500 3351 000 4 Pressure relief valve assembly 1500 3377 000 5 Latch rim 1500 3352 000 6 Manifold bellows base 1500 3350 000 7 Seal base 1500 3359 000 M1207027 004 MANUAL DOC T...

Страница 215: ...Sensor 1 2 Item Description Stock number 1 Flow sensor assembly M1174442 S1 2 Elbow connector M1171751 S M1207027 004 MANUAL DOC Technical Reference Manual Technical Reference Manual for 9100c English...

Страница 216: ...L 50 DURO 1407 3129 000 10 O ring 50 39 ID 57 45 OD 3 53 W SIL 50 DURO 1407 3143 000 11 O ring OD30 ID 22 4W SIL 40 DURO 1407 3104 000 2 12 Valve Housing Assembly Bypass 1407 3126 000 13 Screw Thumb M...

Страница 217: ...2 2 7 Valve flapper O ring 30 ID x 33 6 OD 0211 1454 100 M1168794 S 8 Seat MOPV and free breathing valve Screw M4x25 M1184062 S M1168479 S 3 9 Seal Mechanical overpressure valve 1503 3016 000 10 Mecha...

Страница 218: ...oard Front Panel M1187773 S 2 Blank Cover Label M1198389 S 3 Screw relieved M4x12 1504 3001 000 4 4 Bracket Display Back M1187294 S 5 Screw M4x8 pan head SST Cross recess M1168622 S 4 M1207027 004 MAN...

Страница 219: ...DC To AC Inverter 5W for one bulb M1197808 S 6 Rear enclosure M1187243 S 7 Harness Back Light M1188284 S 8 Harness LCD to DMB M1197820 S 9 Screw M3x6 0140 6219 128 2 10 Speaker with harness M1081516...

Страница 220: ...touch M1081590 S 3 Fixture display LCD enclosure M1187245 S 4 Screw M3x6 0140 6219 128 4 5 Gasket EMC 2 2 OD hollow RND per enclosure M1120773 S 6 Front Enclosure M1187240 S 7 LCD with protect spiral...

Страница 221: ...000 2 Tees tube tube standpipe 6mm O2 1006 3862 000 8mm Air Drive gas 1009 3370 000 3 Elbow tube standpipe 8mm Air 1006 3535 000 4 Y 8mm Y with tailpiece 1009 3360 000 5 Plug 4mm N2O 1006 3530 000 6m...

Страница 222: ...170 mm 1 4 inch 1001 3064 000 21 VAP OUT CGO valve 56 900 mm 1 4 inch 1001 3064 000 Sample Gas 22 AGSS Gas OUT BS Interface Refer to section 10 13 ITEM 17 60 240 mm 1 4 inch 1605 1001 000 23 P Connect...

Страница 223: ...5700 000 4 Harness O2 cell 1009 5586 000 5 Harness Breathing system connect M1194570 S 6 Harness Bag Vent switch 1009 5585 000 7 Harness CO2 bypass 1407 3144 000 8 Harness O2 cell to CSB M1194573 S 9...

Страница 224: ...enging System AGSS 10 20 1 Passive AGSS 1 2 21 20 22 17 3 12 18 19 8 11 4 5 6 5 16 9 10 14 15 14 13 7 M1207027 004 MANUAL DOC Technical Reference Manual Technical Reference Manual for 9100c English Re...

Страница 225: ...OD silicone 1407 3104 000 2 9 O ring 21 95 ID 23 90 OD 1406 3558 000 10 Screw M4x8 9211 0640 083 2 11 Cap 3 18 barb silicone 1406 3524 000 12 Connector plate AGSS M1192893 S 13 Receiver passive adjus...

Страница 226: ...0 2 Adjustable AGSS 1 2 21 20 22 17 3 12 18 19 8 11 4 5 6 5 16 9 10 14 15 23 13 7 M1207027 004 MANUAL DOC Technical Reference Manual Technical Reference Manual for 9100c English Reproduced from the el...

Страница 227: ...O ring 21 95 ID 23 90 OD 1406 3558 000 10 Screw M4x8 9211 0640 083 2 11 Cap 3 18 barb silicone 1406 3524 000 12 Connector plate AGSS M1192893 S 13 Receiver passive adjustable 1407 3908 000 14 Plug As...

Страница 228: ...AGSS 1 2 21 20 22 17 3 12 18 19 8 11 4 5 6 5 16 9 10 7 13 14 15 14 23 16a 16b 16c 16d 16e M1207027 004 MANUAL DOC Technical Reference Manual Technical Reference Manual for 9100c English Reproduced fr...

Страница 229: ...3 S 22 Receiver cover AGSS M1192887 S Active AGSS specific parts 13 Receiver with air brake 1407 3900 000 14 Seal for filter and orifice 1407 3902 000 2 15 Filter 1406 3521 000 Active High Flow specif...

Страница 230: ...009 3160 000 0210 0691 300 4 Screw M4x25 M1168479 S 2 AGSS Flowtube 5 Label flow indicator AGSS Label blank for machines without flow indicator 1406 3527 000 1009 3241 000 6 Flowtube AGSS 1406 3560 00...

Страница 231: ...11 3 Tubing 11 4 Figure 11 4 Wiring harnesses 11 5 Figure 11 5 Ventilator functional block diagram 11 6 Figure 11 6 Control sample board block diagram 11 7 Figure 11 7 Display monitor board block diag...

Страница 232: ...as throttles 41 Patient lung 14 Flowmeter module 42 Negative pressure relief valve 15 O2 flush 43 Absorber canister 16 Vaporizer manifold 44 BTV switch 17 37 9 kPa relief valve 45 Bag 18 Vaporizer 46...

Страница 233: ...e See Note Flow Indicator Room Air Reservoir Reservoir Reservoir Filter High or Low Flow Orifice Key to Symbols Plugged port 1 8 inch for sample gas return Plugged port 30 mm for auxiliary breathing s...

Страница 234: ...0 100 200 150 100 50 psi kPa x 725 1450 2175 2900 N20 AIR 02 AIR N20 02 3 4 5 6 8 43 58 73 87 kPa x 100 3 4 5 6 8 43 58 73 87 kPa x 100 3 4 5 6 8 43 58 73 87 kPa x 100 ISO Tec 7 SEV Tec 7 O2 AIR O 2 N...

Страница 235: ...matics and Diagrams M1207026 11 5 Figure 11 4 Wiring harnesses M1207027 004 MANUAL DOC Technical Reference Manual Technical Reference Manual for 9100c English Reproduced from the electronic master in...

Страница 236: ...11 6 M1207026 Figure 11 5 Ventilator functional block diagram M1207027 004 MANUAL DOC Technical Reference Manual Technical Reference Manual for 9100c English Reproduced from the electronic master in M...

Страница 237: ...d Diagrams M1207026 11 7 Figure 11 6 Control sample board block diagram M1207027 004 MANUAL DOC Technical Reference Manual Technical Reference Manual for 9100c English Reproduced from the electronic m...

Страница 238: ...11 8 M1207026 Figure 11 7 Display monitor board block diagram M1207027 004 MANUAL DOC Technical Reference Manual Technical Reference Manual for 9100c English Reproduced from the electronic master in M...

Страница 239: ...Figure 11 8 Schematic AC inlet module 100 120 V Figure 11 9 Schematic AC inlet module 220 240 V M1207027 004 MANUAL DOC Technical Reference Manual Technical Reference Manual for 9100c English Reprodu...

Страница 240: ...9100c 11 10 M1207026 M1207027 004 MANUAL DOC Technical Reference Manual Technical Reference Manual for 9100c English Reproduced from the electronic master in MATRIX...

Страница 241: ...E Viet Nam Limited Sun Wah Tower Suite 1202 115 Nguyen Hue Street Ho Chi Minh City Vietnam Tel 848 812 9399 Fax 848 821 9482 Australia New Zealand GE Healthcare Australia Pty Ltd Parklands Estate Buil...

Отзывы: