6 Installation and Maintenance
M1207026
6-9
6.6 Exhalation valve relief valve test
1.
Connect the open end of the patient Y-piece to the bag port
handle.
2.
Occlude the bag port.
3.
Remove the scavenger receiver,
reservoir and side cover, if
equipped.
4.
Connect the AGSS adapter to the
down tube located under the
exhalation valve.
5.
Occlude the AGSS adapter with a
stopper (M1210946).
6.
Set the APL valve to minimum and Bag/Vent switch to Bag
position.
7.
Adjust the O
2
flow to 6 L/min.
8.
After 1 minute, observe the Patient Airway on the vent display
and/or airway pressure gauge. The pressure should indicate a
pressure rise of less than 10 cm H
2
O.
Note
: If the pressure rise is more than 10 cm H
2
O, replace the 10
cm H
2
O dead weight and seat. Repeat the test procedure after
the replacement.
9.
Remove the occlusions from the down tube and bag port.
Remove the patient Y-piece from the bag port handle.
10. Reassemble in reverse order.
11. Perform the Preoperative Checkout Procedure
(refer to the 9100c User’s Reference Manual).
AGSS
Adapter
M1207027
004
MANUAL−DOC, Technical Reference Manual, Technical Reference Manual for 9100c, English−default
Reproduced from the electronic master in MATRIX