GE H
EALTHCARE
D
IRECTION
5394227, 12
LOGIQ S8/LOGIQ E8 S
ERVICE
M
ANUAL
Section 9-4 - Maintenance task schedule
9 - 5
Battery
Battery deterioration
When the system detects the battery deterioration, the
“Battery deterioration” dialog displays.
Replace the battery for proper function.
•
When “Battery
deterioration” message will
be displayed, call to GE
Service.
Battery Refresh
If the user doesn’t maintain the battery as indicated in
Basic User Manual Chapter 3 “Refreshing battery”,
refresh the battery every 6 months for the user.
Refresh procedure:
1. Turn on the system.
2. Wait until the battery is fully charged. it takes at least 1
hour to fully charge the battery.
3. Turn off the system.
4. Remove all probes.
5. Turn on the system.
6. Unplug the AC cable and wait until the system shuts
down. It may take 30 minutes or more to complete
shutdown.
7. Wait at least 5 hours.
8. Plug in the AC cable.
9. Turn on the system.
10. Wait until the battery is fully charged. It takes about 3
hours to fully charge the battery.
•
Every 6 months
Table 9-1
Customer Care Schedule
Item
Service at Indicated Time
D
W
M
A
Notes
Содержание 5418099
Страница 11: ...GE HEALTHCARE DIRECTION 5394227 12 LOGIQ S8 LOGIQ E8 SERVICE MANUAL ix ZH CN KO ...
Страница 12: ...GE HEALTHCARE DIRECTION 5394227 12 LOGIQ S8 LOGIQ E8 SERVICE MANUAL x ...
Страница 16: ...GE HEALTHCARE DIRECTION 5394227 12 LOGIQ S8 LOGIQ E8 SERVICE MANUAL xiv This page was intentionally left blank ...
Страница 32: ...GE HEALTHCARE DIRECTION 5394227 12 LOGIQ S8 LOGIQ E8 SERVICE MANUAL 16 ...
Страница 176: ...GE HEALTHCARE PROPRIETARY TO GE DIRECTION 5394227 12 LOGIQ S8 LOGIQ E8 SERVICE MANUAL 3 98 Section 3 16 Paperwork ...
Страница 416: ...GE HEALTHCARE DIRECTION 5394227 REVISION 12 LOGIQ S8 LOGIQ E8 SERVICE MANUAL Index 4 ...
Страница 417: ......