Sludge Dewatering and Odor Control at Plant 1
Specification: 16340
Project No. P1-101
Medium Voltage Switchgear
Designation
Shop Order
SWITCHGEAR SWGR-Q-A ( 15LSWGR901 )
111027-01
SWITCHGEAR SWGR-Q-B ( 15LSWGR902 )
111027-04
12.47KV SERVICE CENTER ADDITIONS
111027-01
General Procedures
Startup: Normal/Emergency
Device/System
Publication/Drawing
Vol.
Tab
Medium Voltage Switchgear
GEK-39672
Page 36
1
3A
Medium Voltage Breakers
01.4IB.66000A
Chapter 4
1
3A
Operation: Normal/Emergency
*
Refer to the publication/drawing listed below for operation of the following:
Device/System
Publication/Drawing
Vol.
Tab
Medium Voltage Switchgear
GEK-39672
Page 36
1
3A
Medium Voltage Breakers
01.4IB.66000A
Chapter 3
1
3A
Breaker/PT Lift Cart
GEK-90214
Complete
1
3A
Breaker Test Cabinet
GEK-105263
Complete
1
3A
Ground & Test Device
GEK-90212
Complete
1
3A
Shutdown: Normal
*
Open feeder breakers to disconnect loads.
*
Shutdown: Emergency
*
Open each Main Breaker to remove the respective switchgear bus from upstream power system.
Location
Open each Main Breaker to remove the respective switchgear bus from upstream power system.
480-Z7612-16340-SOI
Supplemental Operational Information
Location
Operation / Maintenance
Содержание 15LSWGR901
Страница 59: ......
Страница 89: ......
Страница 90: ......
Страница 91: ......
Страница 92: ......
Страница 93: ...equipment not ...
Страница 94: ......
Страница 95: ...the Fig 3 89184386 ...
Страница 96: ...Fig 5 0209B4678 Rev 0 Fig 5 0209B4645 Rev 0 ...
Страница 97: ...Figs ...
Страница 98: ...charge ...
Страница 99: ......
Страница 100: ......
Страница 101: ...Fig 7 0209B4649 1 Rev 1 ...
Страница 102: ......
Страница 103: ......
Страница 104: ......
Страница 105: ......
Страница 106: ......
Страница 107: ...copper and bushings ...
Страница 108: ......
Страница 109: ...drawings particular ...
Страница 110: ......
Страница 111: ......
Страница 112: ......
Страница 113: ......
Страница 114: ......
Страница 115: ......
Страница 116: ......
Страница 117: ......
Страница 118: ......
Страница 119: ......
Страница 120: ...lower followed Fig 32 ...
Страница 121: ......
Страница 122: ...in against ...
Страница 123: ...ground sheath risers convenient ...
Страница 124: ...ground in ...
Страница 125: ......
Страница 126: ...until it will be a ...
Страница 127: ...conductor DE APPARATUS THE FICE then ...
Страница 128: ...the Fig 40 891439D 1 ...
Страница 129: ...MAKE THE FIG 42 891848 ...
Страница 130: ...in ...
Страница 131: ...responsible policy Fig 45 8918438H ...
Страница 132: ...be enamel ...
Страница 133: ...sealer be this Fig 46 8042976 ...
Страница 134: ......
Страница 135: ...50 49 ...
Страница 136: ...Fig 53 Fig 52 Fig 51 8043114 ...
Страница 137: ...Fig 54 ...
Страница 149: ......
Страница 150: ...62 Intentionally Left Blank ...
Страница 151: ...63 Intentionally Left Blank ...
Страница 152: ......
Страница 153: ......
Страница 154: ......
Страница 155: ......
Страница 156: ...6 ...
Страница 157: ......
Страница 158: ......
Страница 159: ......
Страница 160: ......
Страница 161: ......
Страница 162: ......
Страница 163: ......
Страница 164: ......
Страница 166: ......
Страница 173: ...Power Vac Test Cabinet Section 5 Maintenance Fig 3 Test Cabinet Wiring Diagram for 1 Trip Coil 7 ...
Страница 174: ...Fig 4 Test Cabinet Wiring Diagram for 2 Trip C 8 ...
Страница 175: ...Fig 5 Test Cabinet Wiring Diagram for 1 Trip Coil UVTD 9 ...
Страница 186: ...10 ...
Страница 187: ...11 ...