3
3
3
FT & RT Test Switches
www.GEDigitalEnergy.com
FT Test Plugs
The Test Plug with a maximum of 10 positions is designed to match
the pole configuration of specific styles of FT Switches. Not every
switch configuration is suitable to accept a Test Plug. For available
styles, see switch selection tables.
In-Service Series Test Plug
Provision is made only on current poles with shorting springs to
automatically short-circuit current transformer circuits when the
knife switches are opened prior to inserting the Test Plug.
This Test Plug is typically used to connect devices measuring the
currents and voltages being applied to the switchboard relays, meters
and instruments without interrupting or short-circuiting the circuit.
Only the current test switches with the current jack must be opened
before inserting the Series Test Plug. Connections to the test plug must
be made before inserting the test plug into the FT Switch. Before
inserting the Test Plug, all switchblades that are opposite bi-conductor
paddles must be placed in the full open position.
Single Pole Current Test Plug with Open
Secondary CT Protection
secondary
and deviation from correct test procedures
! "
installed meters, relays and CT’s
How it works
If a CT opens during operation:
#
voltage conditions for personnel and equipment
$%&
circuit causing an over-voltage condition
Features
% ##
measurement with an ammeter
'*++;<+
$%& #
& ==>
"
?@=D=%%%GMQX+
10-Pole “In-Service Series” Test Plug Inserted into FT Test Switch
Ordering Information:
Catalog Number
Open Circuit CT Protection
SPTP-01
Yes
SPTP-02
No
10-Pole “In-Service Series” Test Plug
Содержание 15LSWGR901
Страница 59: ......
Страница 89: ......
Страница 90: ......
Страница 91: ......
Страница 92: ......
Страница 93: ...equipment not ...
Страница 94: ......
Страница 95: ...the Fig 3 89184386 ...
Страница 96: ...Fig 5 0209B4678 Rev 0 Fig 5 0209B4645 Rev 0 ...
Страница 97: ...Figs ...
Страница 98: ...charge ...
Страница 99: ......
Страница 100: ......
Страница 101: ...Fig 7 0209B4649 1 Rev 1 ...
Страница 102: ......
Страница 103: ......
Страница 104: ......
Страница 105: ......
Страница 106: ......
Страница 107: ...copper and bushings ...
Страница 108: ......
Страница 109: ...drawings particular ...
Страница 110: ......
Страница 111: ......
Страница 112: ......
Страница 113: ......
Страница 114: ......
Страница 115: ......
Страница 116: ......
Страница 117: ......
Страница 118: ......
Страница 119: ......
Страница 120: ...lower followed Fig 32 ...
Страница 121: ......
Страница 122: ...in against ...
Страница 123: ...ground sheath risers convenient ...
Страница 124: ...ground in ...
Страница 125: ......
Страница 126: ...until it will be a ...
Страница 127: ...conductor DE APPARATUS THE FICE then ...
Страница 128: ...the Fig 40 891439D 1 ...
Страница 129: ...MAKE THE FIG 42 891848 ...
Страница 130: ...in ...
Страница 131: ...responsible policy Fig 45 8918438H ...
Страница 132: ...be enamel ...
Страница 133: ...sealer be this Fig 46 8042976 ...
Страница 134: ......
Страница 135: ...50 49 ...
Страница 136: ...Fig 53 Fig 52 Fig 51 8043114 ...
Страница 137: ...Fig 54 ...
Страница 149: ......
Страница 150: ...62 Intentionally Left Blank ...
Страница 151: ...63 Intentionally Left Blank ...
Страница 152: ......
Страница 153: ......
Страница 154: ......
Страница 155: ......
Страница 156: ...6 ...
Страница 157: ......
Страница 158: ......
Страница 159: ......
Страница 160: ......
Страница 161: ......
Страница 162: ......
Страница 163: ......
Страница 164: ......
Страница 166: ......
Страница 173: ...Power Vac Test Cabinet Section 5 Maintenance Fig 3 Test Cabinet Wiring Diagram for 1 Trip Coil 7 ...
Страница 174: ...Fig 4 Test Cabinet Wiring Diagram for 2 Trip C 8 ...
Страница 175: ...Fig 5 Test Cabinet Wiring Diagram for 1 Trip Coil UVTD 9 ...
Страница 186: ...10 ...
Страница 187: ...11 ...