58
06/06/2005
Addendum #2 to GEK-39672G
Instructions for bolting stacks together across shipping split sections
Introduction
PowerVac switchgear is shipped in splits of one, two, three or four stacks. This
instruction provides details on bolting the stacks together across the shipping splits. This
instruction is applicable to indoor, indoor drip proof and outdoor switchgear. However,
for indoor drip proof and outdoor construction additional assembly instructions for
connecting the roof and aisle sections are provided in the INSTALLATION section of
this instruction book.
WARNING : All primary and secondary circuit devices must be de-energized and the
primary circuit grounded before undertaking any work on the switchgear.
All breakers have to be racked out and PT/CPT rollouts have to be drawn out of the
shipping split stacks before proceeding with the inter-unit bolting.
Step – 1, Inter-unit bus connections.
Make inter-unit bus connections as specified in addendum #1 of GEK-39672G.
Step –2, Center-post bolting
Two sets of 0.38 x 3.00 inch hardware and two sets of 0.38 x 3.25 inch hardware are
provided for this purpose. Refer Fig A(2)-1 and Fig A(2)-2.
Содержание 15LSWGR901
Страница 59: ......
Страница 89: ......
Страница 90: ......
Страница 91: ......
Страница 92: ......
Страница 93: ...equipment not ...
Страница 94: ......
Страница 95: ...the Fig 3 89184386 ...
Страница 96: ...Fig 5 0209B4678 Rev 0 Fig 5 0209B4645 Rev 0 ...
Страница 97: ...Figs ...
Страница 98: ...charge ...
Страница 99: ......
Страница 100: ......
Страница 101: ...Fig 7 0209B4649 1 Rev 1 ...
Страница 102: ......
Страница 103: ......
Страница 104: ......
Страница 105: ......
Страница 106: ......
Страница 107: ...copper and bushings ...
Страница 108: ......
Страница 109: ...drawings particular ...
Страница 110: ......
Страница 111: ......
Страница 112: ......
Страница 113: ......
Страница 114: ......
Страница 115: ......
Страница 116: ......
Страница 117: ......
Страница 118: ......
Страница 119: ......
Страница 120: ...lower followed Fig 32 ...
Страница 121: ......
Страница 122: ...in against ...
Страница 123: ...ground sheath risers convenient ...
Страница 124: ...ground in ...
Страница 125: ......
Страница 126: ...until it will be a ...
Страница 127: ...conductor DE APPARATUS THE FICE then ...
Страница 128: ...the Fig 40 891439D 1 ...
Страница 129: ...MAKE THE FIG 42 891848 ...
Страница 130: ...in ...
Страница 131: ...responsible policy Fig 45 8918438H ...
Страница 132: ...be enamel ...
Страница 133: ...sealer be this Fig 46 8042976 ...
Страница 134: ......
Страница 135: ...50 49 ...
Страница 136: ...Fig 53 Fig 52 Fig 51 8043114 ...
Страница 137: ...Fig 54 ...
Страница 149: ......
Страница 150: ...62 Intentionally Left Blank ...
Страница 151: ...63 Intentionally Left Blank ...
Страница 152: ......
Страница 153: ......
Страница 154: ......
Страница 155: ......
Страница 156: ...6 ...
Страница 157: ......
Страница 158: ......
Страница 159: ......
Страница 160: ......
Страница 161: ......
Страница 162: ......
Страница 163: ......
Страница 164: ......
Страница 166: ......
Страница 173: ...Power Vac Test Cabinet Section 5 Maintenance Fig 3 Test Cabinet Wiring Diagram for 1 Trip Coil 7 ...
Страница 174: ...Fig 4 Test Cabinet Wiring Diagram for 2 Trip C 8 ...
Страница 175: ...Fig 5 Test Cabinet Wiring Diagram for 1 Trip Coil UVTD 9 ...
Страница 186: ...10 ...
Страница 187: ...11 ...