8
BE1-27, 59, 27/59
STYLE NUMBER IDENTIFICATION CHART
Printed in U.S.A.
www.basler.com
12570 State Route 143, Highland, Illinois 62249-1074 USA
Tel +1 618.654.2341 Fax +1 618.654.2351
e-mail: [email protected]
No. 59 Heshun Road Loufeng District (N),
Suzhou Industrial Park, 215122, Suzhou, P.R.China
Tel +86(0)512 8227 2888 Fax +86(0)512 8227 2887
e-mail: [email protected]
P.A.E. Les Pins, 67319 Wasselonne Cedex FRANCE
Tel +33 3.88.87.1010 Fax +33 3.88.87.0808
e-mail: [email protected]
111 North Bridge Road #15-06 Peninsula Plaza
Singapore 179098
Tel +65 68.44.6445 Fax +65 65.68.44.8902
e-mail: [email protected]
BE1-27
BE1-59
BE1-27/59
OR
OR
MODEL NUMBER
STYLE NUMBER
Timing
27 or 59
A1)
Instantaneous
C1) Short inverse
C2) Medium inverse
C3) Long inverse
E1)
Definite
27/59
A1)
Instantaneous
Instantaneous
C4) Short inverse
Short inverse
C5) Medium inverse
Medium inverse
C6) Long inverse
Long inverse
C7) Medium inverse
Short inverse
C8) Long inverse
Medium inverse
D1) Short inverse
Instantaneous
D2) Medium inverse
Instantaneous
D3) Short inverse
Definite
D4) Medium inverse
Definite
E1)
Definite
Definite
E2)
Definite
Instantaneous
Under
Over
Option 3
27 or 59
0)
None
None
1)
NO relay
None
2)
NC relay
None
3)
NO relay
NO relay
4)
NC relay
NC relay
5)
SPDT relay
None
6)
SPDT relay
SPDT relay
27/59
0)
None
None
1)
NO relays
None
2)
NC relays
None
3)
NO relays
NO relays
4)
NC relays
NC relays
Timed Aux.
Inst. Aux.
Timed Aux.
Inst. Aux.
Option 1
27 or 59
0)
None
1)
Instantaneous
function
27/59
0)
None
2)
Instantaneous
under function
3)
Instantaneous
over function
4)
Instantaneous
under and over function
Power Supply
J)
125 Vdc/120 Vac
K) 48 Vdc
L)
24 Vdc
Y) 48/125 Vdc
Z) 250 Vdc/240 Vac
Option 2
N) None
A) Power supply status
output
B) Power supply status
output and push-to-
energize outputs
S) Push-to-energize
outputs
Option 4
F) Semi-flush mounting
P) Projection mounting
Sensing
Input Range
2)
1 to 40 Vac
pickup
3)
55 to 160 Vac
pickup
4)
110 to 320 Vac
pickup
Sensing Input Type
A) Single-phase
A
Target
N) None
A) Internally
operated
B) Current
operated
Output
27 or 59
E)
NO relay
G)
NC relay
27/59
F)
NO relay
NO relay
H)
NC relay
NC relay
N)
NC relay
NO relay
P)
NO relay
NC relay
Under
Over
P0054-05
NOTES
1
If target is B, output must be E or F.
2
If option 2 is A or B, option 3 must be 0, 1,
2, or 5.
3
If option 1 is 0, option 3 must be 0, 1, 2, or 5.
5
If sensing input range is 2, timing must be A1,
E1, or E2.
All relays are supplied in an S1 case size.
4
If option 3 is 3, 4, or 6, option 1 must be 1, 2,
3, or 4.
2
5
4
3
1
This Project
BE1-27-A-3-E-E1-J-A-1-S-3-F
Содержание 15LSWGR901
Страница 59: ......
Страница 89: ......
Страница 90: ......
Страница 91: ......
Страница 92: ......
Страница 93: ...equipment not ...
Страница 94: ......
Страница 95: ...the Fig 3 89184386 ...
Страница 96: ...Fig 5 0209B4678 Rev 0 Fig 5 0209B4645 Rev 0 ...
Страница 97: ...Figs ...
Страница 98: ...charge ...
Страница 99: ......
Страница 100: ......
Страница 101: ...Fig 7 0209B4649 1 Rev 1 ...
Страница 102: ......
Страница 103: ......
Страница 104: ......
Страница 105: ......
Страница 106: ......
Страница 107: ...copper and bushings ...
Страница 108: ......
Страница 109: ...drawings particular ...
Страница 110: ......
Страница 111: ......
Страница 112: ......
Страница 113: ......
Страница 114: ......
Страница 115: ......
Страница 116: ......
Страница 117: ......
Страница 118: ......
Страница 119: ......
Страница 120: ...lower followed Fig 32 ...
Страница 121: ......
Страница 122: ...in against ...
Страница 123: ...ground sheath risers convenient ...
Страница 124: ...ground in ...
Страница 125: ......
Страница 126: ...until it will be a ...
Страница 127: ...conductor DE APPARATUS THE FICE then ...
Страница 128: ...the Fig 40 891439D 1 ...
Страница 129: ...MAKE THE FIG 42 891848 ...
Страница 130: ...in ...
Страница 131: ...responsible policy Fig 45 8918438H ...
Страница 132: ...be enamel ...
Страница 133: ...sealer be this Fig 46 8042976 ...
Страница 134: ......
Страница 135: ...50 49 ...
Страница 136: ...Fig 53 Fig 52 Fig 51 8043114 ...
Страница 137: ...Fig 54 ...
Страница 149: ......
Страница 150: ...62 Intentionally Left Blank ...
Страница 151: ...63 Intentionally Left Blank ...
Страница 152: ......
Страница 153: ......
Страница 154: ......
Страница 155: ......
Страница 156: ...6 ...
Страница 157: ......
Страница 158: ......
Страница 159: ......
Страница 160: ......
Страница 161: ......
Страница 162: ......
Страница 163: ......
Страница 164: ......
Страница 166: ......
Страница 173: ...Power Vac Test Cabinet Section 5 Maintenance Fig 3 Test Cabinet Wiring Diagram for 1 Trip Coil 7 ...
Страница 174: ...Fig 4 Test Cabinet Wiring Diagram for 2 Trip C 8 ...
Страница 175: ...Fig 5 Test Cabinet Wiring Diagram for 1 Trip Coil UVTD 9 ...
Страница 186: ...10 ...
Страница 187: ...11 ...