54
Fig – A(1)-6
Location of tape
Fig A(1)-7
Typical Bus compartment with polyester glass inter-unit bus support
Step – 6 Align switchgear stacks
a)
Gently align the next stack on the left with this stack taking care not to damage
the porcelain bus supports.
b)
When the eight bus support holes ( four holes for polyester glass bus supports )
are aligned, replace the bus support assembly against the side sheet and use the ¼
- 20 hardware to fasten the bus supports and the two side-sheets together as shown
in Fig A(1)-8
c)
A black rubber gasket is provided to cover the edge of the side sheets around the
perimeter of the bus pass-through cutout for 15kV gear. It should be ensured that
this gasket is in place.
Содержание 15LSWGR901
Страница 59: ......
Страница 89: ......
Страница 90: ......
Страница 91: ......
Страница 92: ......
Страница 93: ...equipment not ...
Страница 94: ......
Страница 95: ...the Fig 3 89184386 ...
Страница 96: ...Fig 5 0209B4678 Rev 0 Fig 5 0209B4645 Rev 0 ...
Страница 97: ...Figs ...
Страница 98: ...charge ...
Страница 99: ......
Страница 100: ......
Страница 101: ...Fig 7 0209B4649 1 Rev 1 ...
Страница 102: ......
Страница 103: ......
Страница 104: ......
Страница 105: ......
Страница 106: ......
Страница 107: ...copper and bushings ...
Страница 108: ......
Страница 109: ...drawings particular ...
Страница 110: ......
Страница 111: ......
Страница 112: ......
Страница 113: ......
Страница 114: ......
Страница 115: ......
Страница 116: ......
Страница 117: ......
Страница 118: ......
Страница 119: ......
Страница 120: ...lower followed Fig 32 ...
Страница 121: ......
Страница 122: ...in against ...
Страница 123: ...ground sheath risers convenient ...
Страница 124: ...ground in ...
Страница 125: ......
Страница 126: ...until it will be a ...
Страница 127: ...conductor DE APPARATUS THE FICE then ...
Страница 128: ...the Fig 40 891439D 1 ...
Страница 129: ...MAKE THE FIG 42 891848 ...
Страница 130: ...in ...
Страница 131: ...responsible policy Fig 45 8918438H ...
Страница 132: ...be enamel ...
Страница 133: ...sealer be this Fig 46 8042976 ...
Страница 134: ......
Страница 135: ...50 49 ...
Страница 136: ...Fig 53 Fig 52 Fig 51 8043114 ...
Страница 137: ...Fig 54 ...
Страница 149: ......
Страница 150: ...62 Intentionally Left Blank ...
Страница 151: ...63 Intentionally Left Blank ...
Страница 152: ......
Страница 153: ......
Страница 154: ......
Страница 155: ......
Страница 156: ...6 ...
Страница 157: ......
Страница 158: ......
Страница 159: ......
Страница 160: ......
Страница 161: ......
Страница 162: ......
Страница 163: ......
Страница 164: ......
Страница 166: ......
Страница 173: ...Power Vac Test Cabinet Section 5 Maintenance Fig 3 Test Cabinet Wiring Diagram for 1 Trip Coil 7 ...
Страница 174: ...Fig 4 Test Cabinet Wiring Diagram for 2 Trip C 8 ...
Страница 175: ...Fig 5 Test Cabinet Wiring Diagram for 1 Trip Coil UVTD 9 ...
Страница 186: ...10 ...
Страница 187: ...11 ...