Repair and Adjustment Procedures
Advanced Punch Service Manual
© Copyright 2009 GBC. All rights reserved.
4-25
Figure 4.25 Installing J2 Shaft.
8. Close the Flipper Latch.
Repeat the test of rotating the pulleys to ensure smooth rotation of the Idler
Rollers.
9. Attach the Shaft Spring.
10. Install the front E-Ring to secure.
INSTALL J2 SHAFT
ASSEMBLE BACK
Содержание AdvancedPunch
Страница 1: ...Document 7712571 Rev C1 23 08 2013 AdvancedPunch Technical Service Manual ...
Страница 143: ...Section 5 5 4 Copyright 2009 GBC All rights reserved Advanced Punch Service Manual ...
Страница 144: ...Parts List Advanced Punch Service Manual Copyright 2009 GBC All rights reserved 5 5 ...
Страница 149: ...Section 5 5 10 Copyright 2009 GBC All rights reserved Advanced Punch Service Manual ...
Страница 150: ...Parts List Advanced Punch Service Manual Copyright 2009 GBC All rights reserved 5 11 ...
Страница 195: ...Section 7 7 14 Copyright 2009 GBC All rights reserved Advanced Punch Service Manual 7 2 PCB Assembly ...
Страница 198: ...Installation and Set Up Advanced Punch Service Manual Copyright 2009 GBC All rights reserved 8 3 1 2 1 2 4x 1 2 4x ...
Страница 199: ...Section 8 8 4 Copyright 2009 GBC All rights reserved Advanced Punch Service Manual 2 1 ...
Страница 200: ...Installation and Set Up Advanced Punch Service Manual Copyright 2009 GBC All rights reserved 8 5 2 1 2 1 ...
Страница 201: ...Section 8 8 6 Copyright 2009 GBC All rights reserved Advanced Punch Service Manual 2 1 2 1 2x ...
Страница 202: ...Installation and Set Up Advanced Punch Service Manual Copyright 2009 GBC All rights reserved 8 7 1 3 4x 2 2 1 ...
Страница 203: ...Section 8 8 8 Copyright 2009 GBC All rights reserved Advanced Punch Service Manual 1 2 4x 4x 1 2 ...
Страница 204: ...Installation and Set Up Advanced Punch Service Manual Copyright 2009 GBC All rights reserved 8 9 ...