MDE-5411A ForeHB Islander Prime Installation Manual · October 2018
Page 21
4.1 General
Preliminary Guidelines
4 – Preliminary Guidelines
4.1 General
This section provides preliminary guidelines for Islander Prime. These include:
• Preliminary instructions
• Wiring and wire conduits requirements
• Installation procedures and requirements depend on the specific fuel dispenser models and
the site layout. Therefore, use the information in this section to develop installation plans
for each specific installation.
• Since installation requirements vary from case to case, no installation hardware is supplied
by the equipment manufacturer, and installation planners must develop their own
requirements.
• It is the customer’s responsibility to provide an installation plan designed by an authorized
engineer, and ensure that it adheres to all local standards. This plan design should reflect
the existing electric infrastructure of the site.
Perform a site survey of the station prior to installation.
TIP
4.2 Precautions and Safety Notes
Précautions et consignes de sécurité
Prior to any installation activities, carefully observe the precautions and safety notes below.
Avant toute activité d'installation, observez avec soin les précautions et les consignes de
sécurité ci- dessous.
Содержание Islander Prime
Страница 4: ...This page is intentionally left blank...