background image

Scope of Work/Materials 

 
13850 (28 31 00) - 4 
 
Bid No.041818-Installation of New Fire Alarm System at Adams Elementary School 

 

1.5 

SUBMITTALS 

 

A. 

Comply with the following submittal procedures. 

 

B. 

Include sufficient information, clearly presented, to determine compliance with the specifications 

and the Drawings. 

 
 

C. 

Equipment Submittals: 
1. 

Cover Page:  Indicate the following: 
a. 

Project name and address. 

b. 

E

ngineered systems distributor’s name and other contact information. 

c. 

I

nstalling contractor’s name and other contact information. 

d. 

Date of equipment submittals.  Indicate on revised submittals the original submittal 

date and revised submittal date. 

2. 

Table of Contents:  Lists each section of equipment submittal. 

3. 

Scope of Work Narrative:  Detail indented scope of work. 

4. 

Sequence of Operations:  Use matrix or written text format, detailing activation of each 
type of device and associated resulting activation of the following: 
a. 

Control panel. 

b. 

Annunciator panels. 

c. 

Notification appliances. 

d. 

Building fire safety functions, including elevator recall, elevator power shutdown, 

door lock release, door holder release, HVAC unit shutdown, smoke evacuation 
system activation, and stair pressurization fan activation. 

5. 

Bill of Material:  

OWNER PROVIDED

 

a. 

Quantity. 

b. 

Model number. 

c. 

Description. 

6. 

SLC Circuit Schedule:  Detail address and associated description of each addressable 
device.  Clearly provide information that indicates number of both active and spare 
addresses. 

7. 

Battery Calculations:  Show load of each of, and total of, components of system along with 
standby and alarm times that calculations are based on.  Show calculated spare capacity 
and size of intended battery. 

 

D. 

Shop Drawings: 
1. 

Cover Page:  Indicate the following: 
a. 

Project name and address. 

b. 

E

ngineered systems distributor’s name and other contact information. 

c. 

I

nstalling contractor’s name and other contact information. 

d. 

Date of equipment submittals.  Indicate on revised submittals the original submittal 

date and revised submittal date. 

2. 

Floor Plans: 
a. 

Provide separate floor plan for each floor. 

b. 

If a floor plan must be split using match lines to fit on the page, provide match lines 

and match line references that refer to sheet number that shows area on opposite 
side of match line. 

Содержание E3 Series

Страница 1: ...Data Interchange 2 RS 485 standard defining the electrical characteristics of drivers and receivers for use in balanced digital multipoint systems B National Fire Protection Association NFPA 1 NFPA 12...

Страница 2: ...ary power failure until alarm signal is processed and recorded 7 Network Node Communications a Communicated between panels on single pair of copper wires or fiber optic cables b To enhance system surv...

Страница 3: ...ean control by event programming including as a minimum AND OR NOT and Timer functions 6 Control Panels Capability to accept firmware upgrades via connection with laptop computer without requirement o...

Страница 4: ...uding elevator recall elevator power shutdown door lock release door holder release HVAC unit shutdown smoke evacuation system activation and stair pressurization fan activation 5 Bill of Material OWN...

Страница 5: ...bmittals and shop drawings letter of certification from Gamewell FCI indicating proposed engineered system distributor is an authorized representative in good standing of the equipment supplied Includ...

Страница 6: ...of devices circuits zones and changes to system operation and custom label changes for devices or zones 4 System structure and software shall place no limit on type or extent of software modification...

Страница 7: ...ly Module PM 9 with batteries 3 80 Character LCD Display LCD E3 4 Intelligent Loop Main Board Interface ILI MB E3 or ILI95 MB E3 5 Optional Intelligent Loop Supplemental Interface ILI S E3 or ILI95 S...

Страница 8: ...or and control modules Display shall be liquid crystal type LCD clearly visible in dark and under all light conditions 3 Panel shall contain 4 functional keys a Alarm Acknowledge b Trouble Acknowledge...

Страница 9: ...cuits on SLC or NAC circuits disarrangement in system wiring failure of microprocessor or any identification module or system ground faults shall activate this trouble circuit Trouble signal shall be...

Страница 10: ...ull 4100 event history log supporting local and network functions If a main processor or network node is lost the entire log shall be accessible at any other Loop Interface board This shall be demonst...

Страница 11: ...e alarm systems in accordance with NFPA 72 as it is impossible to test all functions and verify items such as annunciation with only 1 person 24 Signaling Line Circuits Each ILI MB E3 module shall pro...

Страница 12: ...from 64 nodes to 122 nodes ANX SR Addressable Node Expander Single Ring will function in single 64 node systems 3 ANX shall provide a Ethernet Port for use in Systems Integration and for use with Eme...

Страница 13: ...e Detectors Provide 2 status LEDs Both LEDs shall flash under normal conditions indicating detector is operational and in regular communication with control panel and both LEDs shall be placed into st...

Страница 14: ...trol panel send data to panel representing analog level of products of combustion F Intelligent Multi Criteria Acclimating Detectors MCS ACCLIMATE2F 1 Addressable device designed to monitor a minimum...

Страница 15: ...1 The detector shall be comprised of four sensing elements including a photoelectric light scattering particulate sensor an electrochemical CO sensor a daylight filtered infrared IR sensor and solid...

Страница 16: ...hange over air handling systems to help prevent rapid distribution of toxic smoke and fire gases throughout areas served by duct system 3 Duct Smoke Detectors Mounted Above Ceiling or Otherwise Obstru...

Страница 17: ...D to blink latch on or latch off Flash under normal conditions indicating monitor module is operational and in regular communication with control panel P Addressable Dry Contact Monitor Modules MMI 10...

Страница 18: ...module NAC Wire for Style Z or Style Y Class A B with up to 1 amp of inductive signal or 2 amps of resistive signal operation Relay coil shall be magnetically latched to reduce wiring connection requi...

Страница 19: ...nel D NGA Network Graphic Annunciator 1 Main Menu a Configure allows Auto configuration of ILI MB S and NGA or ANX b Walk Drill enables Walk Test and Fire Drill function c I O Allows enable disable in...

Страница 20: ...arm system devices control panels and remote annunciators in finished areas Flush mount or surface mount fire detection and alarm system devices control panels and remote annunciators in unfinished ar...

Страница 21: ...anufacturer representative of Owner and fire department shall operate every installed device to verify proper operation and correct annunciation at control panel 3 Open signaling line circuits and not...

Отзывы: