MegaV2 250 Installation Guide, Release 2.2
1
1.
I
NSTALLATION
A
LL POWER CONNECTIONS MUST BE COMPLETED BY A
LICENSED
ELECTRICIAN WHO IS EXPERIENCED IN WIRING THIS TYPE OF
EQUIPMENT
,
AND WHO IS KNOWLEDGEABLE ABOUT THE NATIONAL AND
LOCAL ELECTRICAL CODES AND REGULATIONS
.
I
MPROPER WIRING MAY CAUSE INJURY TO PERSONNEL OR DAMAGE TO
THE EQUIPMENT
.
1.1
Installation Checklist
Complete the following checklist as you perform the installation, initialization, configuration, and
testing procedures. Refer to the appropriate sections (specified in the
Reference
column) for
detailed information about each checklist item.
When the checklist is complete, fax it to Gamatronic at +972-2-582-8875.
UPS model and configuration
Customer
Address
Site
Phone
Serial numbers:
System_________________Static Switch ____________________
Modules 1___________ 2___________ 3___________ 4___________5___________
6___________ 7___________ 8___________ 9___________ 10___________
Technician Name
Date
Signature
√
Operation
Requirement
Reference
V i s u a l I n s p e c t i o n
Verify the physical integrity of the system
No physical damage
Verify that the number of modules is as ordered,
and that a system controller module is present.
Number of modules is as ordered,
controller module is present.
1.2.1 Step 2
Comments on visual inspection: __________________________________________________
_______________________________________________________________________________
_______________________________________________________________________________
S i t e P r e p a r a t i o n – P h y s i c a l
Check ambient temperature.
Recommended:
betw. +15 °C and +25 °C
(+59 ° F and +77 ° F)
Min/max: –10 °C and +40 °C
(+14 °F and +104 °F)
1.2.2 Step 1
Check humidity and condensation.
No condensation/dampness.
1.2.2 Step 2
Check ventilation.
Proper airflow to batteries.
1.2.2 Step 3
Check foundation and access.
Adequate structure and access.
1.2.2 Step 4
Check for adequate clearances.
1.2.2 Step 5