Revision 1
80
6/27/2017
Figure 7-2: Location of On/Off Switch
c) Access the purged control cabinet following proper company and/or regulatory agency
procedures.
d) Lift the fuse terminal tab opening the terminal block and disconnect the UV Lamp Power
Supply fuse. (ACTS:28) or place the UV Lamp power switch to the Off position (see
Figure 7-2 for the location of the switch).
e) Remove the UV Lamp Power Supply cabinet lid by removing the four (4) s and pulling the
cabinet lid towards you.
f) Remove the two (2) plastic hole plugs from the top of the UV Lamp Power Supply to gain
access to the lamp retaining screws.
g) Disconnect the three (3) lamp connection wires from the terminal strip.
Socket Head Cap Screw
Содержание 943-TGS
Страница 23: ...Revision 1 23 6 27 2017 Figure 2 3 Potted Fixture Figure 2 4 Control Cabinet Fiber Optics Entries ...
Страница 50: ...Revision 1 50 6 27 2017 Figure 4 14 Network Sub Panel ...
Страница 94: ...Revision 1 94 6 27 2017 Figure 9 1 Mounting Detail ...
Страница 95: ...Revision 1 95 6 27 2017 Figure 9 2 Oven Cabinet Detail ...
Страница 96: ...Revision 1 96 6 27 2017 Figure 9 3 Control Cabinet Detail ...
Страница 97: ...Revision 1 97 6 27 2017 Figure 9 4 Power Air Steam Requirements and Input Output Detail ...
Страница 98: ...Revision 1 98 6 27 2017 Figure 9 5 Control Cabinet to Oven Cabinet Interconnect Detail ...
Страница 99: ...Revision 1 99 6 27 2017 Figure 9 6 AC Wiring Detail ...
Страница 100: ...Revision 1 100 6 27 2017 Figure 9 7 DC and Signal Wiring Detail ...
Страница 101: ...Revision 1 101 6 27 2017 This page intentionally left blank ...