Revision 1
16
6/27/2017
Section 2
Installation
The initial installation of the analyzer system is usually completed by the
purchaser. The start-up and commissioning is usually performed by
Galvanic Applied Sciences Inc. personnel.
2.1 Receiving the System
When the system arrives, inspect the packaging for external signs of damage. If there is any
obvious physical damage, contact the shipping agent and Galvanic Applied Sciences to
report the damage and request that the carrier's agent be present when the unit is unpacked.
It is recommended that you retain the shipping container so that it may be used for future
shipment of the unit, if necessary.
2.2 Environmental Requirement
2.2.1 Electrical Requirements
The power input is 100 – 240 V, 1 phase, 50/60 Hz, 800 W. The operating voltage is
specified on the serial number name plate
2.2.2 Temperature
The system is designed to be operated at ambient temperatures from -20
o
C to +60
o
C.
Galvanic offers complete analyzer shelters from sun shades to complete building, please
contact Galvanic Applied Sciences, Inc. (or your local representative) for additional
information.
2.2.3 Space Requirements
The overall outer dimensions of the oven enclosure are 27.5”H (700 mm) x 30.5” W (775
mm) x 25.5” D (648 mm). The installation should allow for access to the oven and the ability
to remove the cover.
The overall outer dimensions of the control cabinet are 46” H (1168 mm) x 33” W (838 mm) x
15” D (381 mm). See Figures 2-1 and 2-2 for more details.
943-TGS-CE
Refer to the 943-TGS-CE User Manual Sections 2.1, 2.2, 2.3, 2.4, 2.5, and
2.6.
Содержание 943-TGS
Страница 23: ...Revision 1 23 6 27 2017 Figure 2 3 Potted Fixture Figure 2 4 Control Cabinet Fiber Optics Entries ...
Страница 50: ...Revision 1 50 6 27 2017 Figure 4 14 Network Sub Panel ...
Страница 94: ...Revision 1 94 6 27 2017 Figure 9 1 Mounting Detail ...
Страница 95: ...Revision 1 95 6 27 2017 Figure 9 2 Oven Cabinet Detail ...
Страница 96: ...Revision 1 96 6 27 2017 Figure 9 3 Control Cabinet Detail ...
Страница 97: ...Revision 1 97 6 27 2017 Figure 9 4 Power Air Steam Requirements and Input Output Detail ...
Страница 98: ...Revision 1 98 6 27 2017 Figure 9 5 Control Cabinet to Oven Cabinet Interconnect Detail ...
Страница 99: ...Revision 1 99 6 27 2017 Figure 9 6 AC Wiring Detail ...
Страница 100: ...Revision 1 100 6 27 2017 Figure 9 7 DC and Signal Wiring Detail ...
Страница 101: ...Revision 1 101 6 27 2017 This page intentionally left blank ...