Furman ASD-120 2.0 Скачать руководство пользователя страница 20

19

ASD-120 2.0 ACTIVATING MULTIPLE FURMAN MP-20 Q UNITS

ON

ASD-120 2.0 DIP SETTINGS

DLY

ADJ

1    2    3    4     5    6    7 

ALWAYS ON 

 ALWAYS OFF 

S

E

Q

SET TO 
MIDDLE 
POSITION

DELAY OUTPUTS

NC   A    B    C    D    E    F   NO

12V   STAT  REM  GND

FORCE 

MP-20 Q #1    MP-20 Q #2    MP-20 Q #3    MP-20 Q #4    MP-20 Q #5    MP-20 Q #6

POSITIVE

TERMINALS

NEGATIVE

TERMINALS

M-8S WITH REMOTE SWITCH TRIGGERS ASD-120 2.0

ON

1     2     3

O

N

ASD-120 2.0 DIP SETTINGS

M-8S DIP SETTINGS

DLY

ADJ

1    2    3    4     5    6    7 

ALWAYS ON 

 ALWAYS OFF 

S

E

Q

SET TO 
MIDDLE 
POSITION

FORCE 

RS-1 REMOTE SWITCH

12V  STAT  REM  GND

12V  STAT  REM  GND

M-8S REMOTE PORT

12V ON

12V OFF 

GND

ON 

MOM

MNT 

DLY

ADJ

 

1  2  3 

1

2

3

REMOTE PORT

12V   STAT  REM   GND

DELAY 3

REMOTE PORT

12V  STAT  REM  GND

AC REL

AY

 ACCESSO

RY

MODE

L PS-REL

C   NO  NC

PS-REL 

PRIMARY M-8S UNIT 

SECONDARY ASD-120 2.0 

ASD-120 2.0

ASD-120 2.0 Sequencer Activates Multiple MP-20Qs via Bank DELAY OUTPUTS A through F. 

Diagram #3 illustrates a Furman ASD-120 2.0 sequencer controlling six Furman MP-20Q units: 

1. Connect REMOTE 12V terminal on ASD-120 2.0 to its own DELAY OUTPUT (NO)  
   terminal.

2. Connect MP-20Q negative (-) terminals to ASD-120 2.0 GND terminal on the  
    REMOTE interface.

3. Connect MP-20Q positive (+) terminals to ASD-120 2.0 DELAY OUTPUT contacts A  
    through F according to the desired match and timing for each MP-20Q. 
 
4. Configure ASD-120 2.0 Multi-Function DIP for factory default, Maintained Mode ON. 

   • DIP 4 UP – (NO), verify factory default.
   • DIP 7 DOWN – MNT, verify factory default.
   • Ensure all Bypass Set DIP switches are SEQ.
   • Configure ASD-120 2.0 Multi-Function DIP switches 1, 2 & 3 to the desired delay 
      time interval. 

MP-20Q units will operate in sync with the ASD-120 2.0 Delay Banks A through F. 

Diagram Example #4

A Furman M-8S Sequencer triggered by an optional RS-1 Remote System Control Panel 
activates a Furman ASD-120 2.0 Sequencers at another in-house location.

Diagram #4 illustrates a Furman M-8S sequencer controlling an ASD-120 2.0 sequencer while 
the optional  RS-1 Remote System Control Panel act as the Primary Security Key Switch. This is 
possible with the use of a Furman PS-REL AC Relay Accessory:

1.

 

Configure ASD-120 2.0 Multi-Function DIP Set for Normally Closed & Maintained  

    Mode ON

   • DIP 1, 2 & 3 DOWN - ASD-120 2.0 Delay Time cannot exceed M-8S Delay Time.
   • DIP 4 UP – (NO), verify factory default.
   • DIP 7 DOWN – MNT, verify factory default.
   • Configure ASD-120 2.0 Multi-Function DIP switches 1, 2 & 3 DOWN for short delay time.
   • Ensure All Bypass Set DIP switches are selected as desired.
   • Set ASD-120 2.0 Key Switch to Remote.

2.

 

RS-1 terminals are connected to the M-8 S REMOTE terminals, pole to pole:

  

   • 12V to 12V, REM to REM, STAT to STAT, and GND to GND.

3.

 

Configure M-8S DIP Set or factory default, Maintained Mode ON.

 

   • Configure M-8S DIP switches 1, 2 & 3 DOWN.
   • Adjust Delay Interval to for a time longer than the ASD-120 2.0 Delay Interval. 
   • Plugged PS-REL into a M-8S Delay 3 Outlet.
   • Connect PS-REL OUTPUT (NC) and (C) terminals to the ASD-120 2.0 12V and REM 
      terminals with a parallel connection: (NC) to 12V and (C) to REM. 
   • Flip the M-8S front panel switch to the ready Sequence On position.

When the M8-S is sequenced ON and its DELAY 3 outlet is energized, the PS-REL AC Relay 
will trigger the ASD-120 2.0 to begin its programmed sequence.

Caution: 

The OFF sequence for the M-8S and ASD-120 2.0 will start at the same time.  

In order to avoid timing conflicts while ramping down, set the M-8S to a longer delay time 
than the total time interval on the ASD-120 2.0 sequencer. 

 

DIAGRAM EXAMPLE 3

 

DIAGRAM EXAMPLE 4

Содержание ASD-120 2.0

Страница 1: ...PUT 120 3 208 240 VAC 14400 WATTS 120 AMPS MAX 20A MAX DELAY A 20A MAX DELAY B 20A MAX DELAY C 20A MAX DELAY D 20A MAX DELAY E 20A MAX DELAY F FORCE OFF DELAY OUTPUTS REMOTE NC A B C D E F NO 12V STAT...

Страница 2: ...ET CONFIER LA MAINTENANCE A UN T ECHNICIEN QUALIFIE DRY RELAY CONTACTS RATING 48V 1 AMP This box should include the following items 1 Model ASD 120 2 0 2 Two adjustable rear rack mounting ears 3 Secu...

Страница 3: ...ASD 120 2 0 please use the Direct Current 12V and REM terminals of the ASD 120 2 0 to provide the DC control signal to the REM input of the older ASD 120 product Ground loops at the control terminals...

Страница 4: ...ND If the loads are balanced the neutral cur rent will be zero but if the load is predominately on one phase the neutral must support the entire load current Since phases are distributed to different...

Страница 5: ...ENCE REMOTE DLY ADJ DELAY A DELAY B DELAY C PHASE X Y Z DELAY D DELAY E DELAY F OFF ON 1 2 3 4 5 6 7 ALWAYS ON ALWAYS OFF ASD 120 2 0 120 AMP POWER SEQUENCER SEE COVER PLATE START SEQUENCE REMOTE DLY...

Страница 6: ...AY F OFF ON ASD 120 2 0 120 AMP POWER SEQUENCER Security Cover to Protect Program Settings 1 5 Cable Clamp Input 120V Phase Six 20A duplex outlets Force Off 2 Pin Phoenix type Connector Remote 4 pin P...

Страница 7: ...ower of 14 4kW Higher levels of power can be achieved by connecting additional Furman sequencers or other power conditioning products including additional ASD 120 2 0 units Furman products provide a p...

Страница 8: ...l of the Delay Bank LEDs should be off Note that the Delay Bank LED indicators only indicate when a bank has been activated The indicators do not guarantee that power is being delivered to the corresp...

Страница 9: ...ector and the front panel START SEQUENCE push button switch Security Cover Shield and DIP Switch Program Interface The ASD 120 2 0 had two configuration DIP switches that are located underneath a secu...

Страница 10: ...1 minute maximum time delay DIP 2 adds 2 minutes and DIP 3 adds 4 minutes Please note these time delays are cumulative If all three DIP switches are in the UP position the maximum allowable time delay...

Страница 11: ...at once once any Momentary switch button is pushed including Remote Momentary switches As mentioned multiple momen tary remote contacts should be used if more than one remote power up location is des...

Страница 12: ...tary Maintained Sets local mode and remote contact closure preference for either Momentary or Maintained switches Note Momentary mode overrides DIP 5 and 6 Sequence Bypass DIP Switch DIP position ON A...

Страница 13: ...0 Delay outlets are OFF To use the STAT terminal output simply connect an LED between the STAT and GND with the Cathode flat side of the LED oriented toward the GND pin Pin 4 Do not use a series curr...

Страница 14: ...e set to OFF A time delayed On or Off sequence can be initiated at the front panel Key Switch the START SEQUENCE button or using the 4 Pin Remote Interface The config uration Multi Function DIP switch...

Страница 15: ...using external 5 to 30VDC power supply In this mode an external power supply will prevent the ASD 120 2 0 from sequencing ON The ASD 120 2 0 will automatically sequence ON when the DC power is remove...

Страница 16: ...uences If the button is pressed and held for more than six seconds the ASD 120 2 0 will sequence to the OFF state The front Start Sequence button should only be used when the Key Switch is in the REMO...

Страница 17: ...state until a connection is present between the REM and GND terminals or between the 12V and REM terminals DIP 7 switch is set in the down position MNT for operation in Maintained Mode And when utiliz...

Страница 18: ...ate of the DC relay as well as its associated AC duplex FORCE OFF Interface Rear Panel 2 pin Connector The FORCE OFF input provides a method of immediately turning off all Bank relays and output circu...

Страница 19: ...ry Mode DIP 4 UP NO verify factory default DIP 7 UP MOM verify Momentary Mode Configure 2 0 Multi Function DIP switches 1 2 3 to desired delay time interval Ensure All Bypass Set DIP switches are sele...

Страница 20: ...Delay Banks A through F Diagram Example 4 A Furman M 8S Sequencer triggered by an optional RS 1 Remote System Control Panel activates a Furman ASD 120 2 0 Sequencers at another in house location Diagr...

Страница 21: ...SD 120 2 0 ADVANCED INSTALLATION WITH FURMAN CN SERIES AND REMOTE RS 1 SWITCH ON ON CN 2400S DIP SETTINGS ASD 120 2 0 DIP SETTINGS FIRE ALARM NO C NC FORCE REMOTE 12V STAT REM GND 12V STAT REM GND DLY...

Страница 22: ...rs one per output Configuration Switches Front panel hidden by security cover 3 maximum delay switches 1 2 and 4 minute Force Off NO NC 12V mode On Off GND mode On Off Momentary Maintained mode select...

Страница 23: ...orce and effect SERVICE NOTE All equipment being returned for repair must have an RMA Return Mate rials Authorization number To receive an RMA number please contact Furman Technical Services at techsu...

Страница 24: ...y the GND ON Maintained Mode should be used Note GND to REM pins should be used for remote triggers with applied DC voltages 5V to 30VDC at REM ASD 120 2 0 PROGRAMMING SUMMARY DIP 7 MOM MNT Maintained...

Отзывы: