318
Upgrade and Maintenance Manual
TX120
S3
System board and components
14.1.5 Concluding steps
Perform the following procedures to complete the task:
Ê
Dispose of the CMOS battery in accordance with local regulations
concerning special waste.
Ê
Close the server cover as described in section
"Closing the server" on
page 70
.
Ê
Reconnect the AC power cord to the power supply unit.
14.2 USB Flash Module (UFM)
This section provides information on how to install, remove or replace the USB
Flash Module (UFM).
14.2.1 Installing the UFM board
14.2.1.1 Required tools
●
Preliminary and concluding steps:
– Phillips PH2 / (+) No. 2 screw driver
●
Installing the UFM: tool-less
14.2.1.2 Preliminary steps
Before installing the UFM board, perform the following steps:
Ê
Disable BitLocker functionality as described in section
"Disabling BitLocker
functionality" on page 79
.
Field Replaceable Units (FRU)
Average hardware task duration: 5 minutes
Average software task duration: 5 minutes
Содержание PRIMERGY TX120 S3
Страница 6: ...Upgrade and Maintenance Manual TX120 S3 ...
Страница 8: ...Upgrade and Maintenance Manual TX120 S3 Version history ...
Страница 22: ...Upgrade and Maintenance Manual TX120 S3 Contents ...
Страница 26: ...26 Upgrade and Maintenance Manual TX120 S3 Introduction ...
Страница 48: ...48 Upgrade and Maintenance Manual TX120 S3 Important information ...
Страница 110: ...110 Upgrade and Maintenance Manual TX120 S3 Basic software procedures ...
Страница 191: ...TX120 S3 Upgrade and Maintenance Manual 191 Expansion cards and backup units Figure 87 Installed BBU in BBU holder ...
Страница 244: ...244 Upgrade and Maintenance Manual TX120 S3 Main memory ...
Страница 362: ...362 Upgrade and Maintenance Manual TX120 S3 System board and components ...
Страница 418: ...418 Upgrade and Maintenance Manual TX120 S3 Cables Figure 276 Installed BBU in BBU holder ...
Страница 422: ...422 Upgrade and Maintenance Manual TX120 S3 Cables ...