TX120 S3
Upgrade and Maintenance Manual
379
Cables
Figure 234: Inserting the front panel cable into the cable clamp.
Ê
Run the front panel cable through the cable clamp.
15.3.5 Concluding steps
Perform the following procedures to complete the task:
Ê
Close the server cover as described in section
"Closing the server" on
page 70
.
Ê
Reconnect the AC power cord to the power supply unit and secure it with a
cable tie as described in section
"Switching on the server" on page 77
.
Содержание PRIMERGY TX120 S3
Страница 6: ...Upgrade and Maintenance Manual TX120 S3 ...
Страница 8: ...Upgrade and Maintenance Manual TX120 S3 Version history ...
Страница 22: ...Upgrade and Maintenance Manual TX120 S3 Contents ...
Страница 26: ...26 Upgrade and Maintenance Manual TX120 S3 Introduction ...
Страница 48: ...48 Upgrade and Maintenance Manual TX120 S3 Important information ...
Страница 110: ...110 Upgrade and Maintenance Manual TX120 S3 Basic software procedures ...
Страница 191: ...TX120 S3 Upgrade and Maintenance Manual 191 Expansion cards and backup units Figure 87 Installed BBU in BBU holder ...
Страница 244: ...244 Upgrade and Maintenance Manual TX120 S3 Main memory ...
Страница 362: ...362 Upgrade and Maintenance Manual TX120 S3 System board and components ...
Страница 418: ...418 Upgrade and Maintenance Manual TX120 S3 Cables Figure 276 Installed BBU in BBU holder ...
Страница 422: ...422 Upgrade and Maintenance Manual TX120 S3 Cables ...