TX120 S3
Upgrade and Maintenance Manual
393
Cables
15.4.5 Concluding steps
Perform the following procedures to complete the task:
Ê
Close the server cover as described in section
"Closing the server" on
page 70
.
Ê
Reconnect the AC power cord to the power supply unit and secure it with a
cable tie as described in section
"Connecting the server to the mains" on
page 73
.
15.5 Replacing the ODD SATA cable
Figure 250: ODD SATA cable T26139-Y3928-V205
Field Replaceable Units (FRU)
Average task duration: 10 minutes
Содержание PRIMERGY TX120 S3
Страница 6: ...Upgrade and Maintenance Manual TX120 S3 ...
Страница 8: ...Upgrade and Maintenance Manual TX120 S3 Version history ...
Страница 22: ...Upgrade and Maintenance Manual TX120 S3 Contents ...
Страница 26: ...26 Upgrade and Maintenance Manual TX120 S3 Introduction ...
Страница 48: ...48 Upgrade and Maintenance Manual TX120 S3 Important information ...
Страница 110: ...110 Upgrade and Maintenance Manual TX120 S3 Basic software procedures ...
Страница 191: ...TX120 S3 Upgrade and Maintenance Manual 191 Expansion cards and backup units Figure 87 Installed BBU in BBU holder ...
Страница 244: ...244 Upgrade and Maintenance Manual TX120 S3 Main memory ...
Страница 362: ...362 Upgrade and Maintenance Manual TX120 S3 System board and components ...
Страница 418: ...418 Upgrade and Maintenance Manual TX120 S3 Cables Figure 276 Installed BBU in BBU holder ...
Страница 422: ...422 Upgrade and Maintenance Manual TX120 S3 Cables ...