TX120 S3
Upgrade and Maintenance Manual
353
System board and components
Figure 213: Installing the system board (B)
Ê
Ensure that the system board is properly seated on both centering bolts (C).
Ê
Secure the system board with eight screws (M3 x 6 mm, C26192-Y10-C68)
(see circles).
I
Screw torque: 0.6 Nm (not applicable for the Japanese market)
Tighten the screws in a cross diagonal pattern.
Ê
Verify the settings on the new system board (jumpers). For a detailed
description, please refer to section
"Onboard settings" on page 429
.
C
C
C
C
Содержание PRIMERGY TX120 S3
Страница 6: ...Upgrade and Maintenance Manual TX120 S3 ...
Страница 8: ...Upgrade and Maintenance Manual TX120 S3 Version history ...
Страница 22: ...Upgrade and Maintenance Manual TX120 S3 Contents ...
Страница 26: ...26 Upgrade and Maintenance Manual TX120 S3 Introduction ...
Страница 48: ...48 Upgrade and Maintenance Manual TX120 S3 Important information ...
Страница 110: ...110 Upgrade and Maintenance Manual TX120 S3 Basic software procedures ...
Страница 191: ...TX120 S3 Upgrade and Maintenance Manual 191 Expansion cards and backup units Figure 87 Installed BBU in BBU holder ...
Страница 244: ...244 Upgrade and Maintenance Manual TX120 S3 Main memory ...
Страница 362: ...362 Upgrade and Maintenance Manual TX120 S3 System board and components ...
Страница 418: ...418 Upgrade and Maintenance Manual TX120 S3 Cables Figure 276 Installed BBU in BBU holder ...
Страница 422: ...422 Upgrade and Maintenance Manual TX120 S3 Cables ...