260
Upgrade and Maintenance Manual
TX120
S3
Processors
Figure 144: Installing the heat sink (B)
Ê
Fasten the four captive screws on the heat sink in a crossover pattern (screw
torque: 0.6 Nm, not applicable for the Japanese market) (1-4).
Ê
Connect the CPU fan cable to the system board.
11.2.8 Concluding steps
Perform the following procedures to complete the task:
Ê
Close the server cover as described in section
"Closing the server" on
page 70
.
Ê
Reconnect the AC power cord to the power supply unit.
Ê
If available, update the system board BIOS to the latest version as described
in section
"Updating or recovering the system board BIOS and iRMC" on
page 86
.
Ê
Enable boot watchdog functionality as described in section
"Enabling SVOM
boot watchdog functionality" on page 96
.
/
0
1
2
Содержание PRIMERGY TX120 S3
Страница 6: ...Upgrade and Maintenance Manual TX120 S3 ...
Страница 8: ...Upgrade and Maintenance Manual TX120 S3 Version history ...
Страница 22: ...Upgrade and Maintenance Manual TX120 S3 Contents ...
Страница 26: ...26 Upgrade and Maintenance Manual TX120 S3 Introduction ...
Страница 48: ...48 Upgrade and Maintenance Manual TX120 S3 Important information ...
Страница 110: ...110 Upgrade and Maintenance Manual TX120 S3 Basic software procedures ...
Страница 191: ...TX120 S3 Upgrade and Maintenance Manual 191 Expansion cards and backup units Figure 87 Installed BBU in BBU holder ...
Страница 244: ...244 Upgrade and Maintenance Manual TX120 S3 Main memory ...
Страница 362: ...362 Upgrade and Maintenance Manual TX120 S3 System board and components ...
Страница 418: ...418 Upgrade and Maintenance Manual TX120 S3 Cables Figure 276 Installed BBU in BBU holder ...
Страница 422: ...422 Upgrade and Maintenance Manual TX120 S3 Cables ...