CX250 S2
Upgrade and Maintenance Manual
129
Expansion cards and battery backup units
6.4.6.4
Installing the mezzanine card
Ê
Install the new mezzanine card as described in section
"Installing the
10 GbT mezzanine card" on page 125
.
6.4.6.5
Concluding steps
Perform the following procedures:
Ê
"Installing the server node in the server enclosure" on page 63
Ê
Reconnect all external cables.
Ê
"Switching on the server node" on page 64
Ê
"Enabling boot watchdog functionality" on page 74
Ê
"After replacing / upgrading LAN controllers" on page 82
(if applicable)
Ê
"Updating the NIC configuration file in a Linux environment" on page 77
Ê
"Looking up changed MAC / WWN addresses" on page 80
Содержание Primergy CX250 S2
Страница 6: ...Upgrade and Maintenance Manual CX250 S2 ...
Страница 16: ...16 Upgrade and Maintenance Manual CX250 S2 ...
Страница 20: ...20 Upgrade and Maintenance Manual CX250 S2 Introduction ...
Страница 30: ...30 Upgrade and Maintenance Manual CX250 S2 Before you start ...
Страница 44: ...44 Upgrade and Maintenance Manual CX250 S2 Important information ...
Страница 184: ...184 Upgrade and Maintenance Manual CX250 S2 Main memory ...
Страница 194: ...194 Upgrade and Maintenance Manual CX250 S2 Processors Figure 106 Opening the load plate B Ê Fully open the load plate ...
Страница 244: ...244 Upgrade and Maintenance Manual CX250 S2 System board and components ...
Страница 254: ...254 Upgrade and Maintenance Manual CX250 S2 Cabling ...