CX250 S2
Upgrade and Maintenance Manual
73
Basic software procedures
5.2.2
Updating RAID controller firmware
After replacing the RAID controller, it is essential to upgrade the firmware to the
latest version. The latest RAID controller firmware version is available from the
Fujitsu support web pages at:
http://ts.fujitsu.com/support/
(EMEA market)
http://jp.fujitsu.com/platform/server/primergy/downloads/
(Japanese market)
I
Fujitsu does not assume responsibility for any damage done to the
server or for the loss of any data resulting from firmware updates.
For the Japanese market, follow the instructions provided separately.
Using the ServerView Update Manager
For a detailed description on how to update the RAID controller firmware using
the ServerView Update Manager or Update Manager Express (UME), please
refer to the following manuals:
– ServerView Update Manager:
"ServerView Update Management" user guide
– ServerView Update Manager Express:
"Local System Update for PRIMERGY Servers" user guide
Using the flash tool
The latest firmware files are available as ASPs (Autonomous Support
Packages) for Windows or as DOS tools from the Fujitsu support web pages at:
http://ts.fujitsu.com/support/
(EMEA market)
http://jp.fujitsu.com/platform/server/primergy/downloads/
(Japanese market)
Ê
Select
Drivers & Downloads
.
Ê
From the
Select Product
drop down lists, choose your PRIMERGY server or
enter its serial or ident number into the search field.
Ê
Select your operating system and version.
Ê
Select the desired component type (e.g. SAS RAID).
Ê
Select your controller from the device list to expand a compilation of
available drivers and firmware.
Ê
Select the desired file and click
Download
for further instructions.
Содержание Primergy CX250 S2
Страница 6: ...Upgrade and Maintenance Manual CX250 S2 ...
Страница 16: ...16 Upgrade and Maintenance Manual CX250 S2 ...
Страница 20: ...20 Upgrade and Maintenance Manual CX250 S2 Introduction ...
Страница 30: ...30 Upgrade and Maintenance Manual CX250 S2 Before you start ...
Страница 44: ...44 Upgrade and Maintenance Manual CX250 S2 Important information ...
Страница 184: ...184 Upgrade and Maintenance Manual CX250 S2 Main memory ...
Страница 194: ...194 Upgrade and Maintenance Manual CX250 S2 Processors Figure 106 Opening the load plate B Ê Fully open the load plate ...
Страница 244: ...244 Upgrade and Maintenance Manual CX250 S2 System board and components ...
Страница 254: ...254 Upgrade and Maintenance Manual CX250 S2 Cabling ...