CX250 S2
Upgrade and Maintenance Manual
95
Expansion cards and battery backup units
Figure 37: Latching the locking bail
Ê
Carefully fold up and latch the locking bail.
Figure 38: Attaching the protective optical port plug
Ê
If the SFP+ transceiver module is not immediately connected to an LC
connector, attach the protective optical port plug to the transceiver optical
bores.
Содержание Primergy CX250 S2
Страница 6: ...Upgrade and Maintenance Manual CX250 S2 ...
Страница 16: ...16 Upgrade and Maintenance Manual CX250 S2 ...
Страница 20: ...20 Upgrade and Maintenance Manual CX250 S2 Introduction ...
Страница 30: ...30 Upgrade and Maintenance Manual CX250 S2 Before you start ...
Страница 44: ...44 Upgrade and Maintenance Manual CX250 S2 Important information ...
Страница 184: ...184 Upgrade and Maintenance Manual CX250 S2 Main memory ...
Страница 194: ...194 Upgrade and Maintenance Manual CX250 S2 Processors Figure 106 Opening the load plate B Ê Fully open the load plate ...
Страница 244: ...244 Upgrade and Maintenance Manual CX250 S2 System board and components ...
Страница 254: ...254 Upgrade and Maintenance Manual CX250 S2 Cabling ...