178
Upgrade and Maintenance Manual
CX250
S2
Main memory
Ê
Connect the SATA cable(s) to the connectors on the system board described
in section
"Connectors on the boards" on page 251
,
figure 150
and reroute
the cables as described in section
"Cabling with onboard controller" on
page 143
or
"Cable routing with onboard controller" on page 145
.
Ê
Identify the correct memory slot according to the mounting order described
in section
"Memory sequence" on page 172
.
Ê
"Installing the server node in the server enclosure" on page 63
Ê
If applicable, reconnect all external cables.
Ê
"Switching on the server node" on page 64
Ê
"Updating or recovering the system board BIOS and BMC" on page 67
(if
applicable)
Ê
"Enabling boot watchdog functionality" on page 74
Ê
"Verifying the memory mode" on page 75
(if applicable)
Содержание Primergy CX250 S2
Страница 6: ...Upgrade and Maintenance Manual CX250 S2 ...
Страница 16: ...16 Upgrade and Maintenance Manual CX250 S2 ...
Страница 20: ...20 Upgrade and Maintenance Manual CX250 S2 Introduction ...
Страница 30: ...30 Upgrade and Maintenance Manual CX250 S2 Before you start ...
Страница 44: ...44 Upgrade and Maintenance Manual CX250 S2 Important information ...
Страница 184: ...184 Upgrade and Maintenance Manual CX250 S2 Main memory ...
Страница 194: ...194 Upgrade and Maintenance Manual CX250 S2 Processors Figure 106 Opening the load plate B Ê Fully open the load plate ...
Страница 244: ...244 Upgrade and Maintenance Manual CX250 S2 System board and components ...
Страница 254: ...254 Upgrade and Maintenance Manual CX250 S2 Cabling ...