26
Upgrade and Maintenance Manual
CX250
S2
Before you start
2.3
Tools you need at hand
When preparing the maintenance task, ensure that all required tools are
available according to the overview below. You will find a list of required tools at
the beginning of each procedure.
Screw driver /
Bit insert
Screw
Usage
Type
Phillips
PH2 / (+) No. 2
hexagonal cross
SW5 / PZ2
Chassis
6-32 x 5.0 mm
MS06050FD40
Phillips
PH2 / (+) No. 2
hexagonal cross
SW5 / PZ2
System board,
riser card,
mezzanine
card
6-32 x 4.7 mm
MU0603EHDD1
Phillips
PH1 / (+) No. 1
BBU
M2.5 x 5.0 mm
MS25050FDR0
Phillips
PH2 / (+) No. 2
hexagonal cross
SW5 / PZ2
BBU holder
6-32 x 6.0 mm
MS06060H290
Phillips
PH1 / (+) No. 1
UFM nylon
screw
M3 x 4.5 mm
(white)
A3C40109082
Table 2: List of required tools and used screws
Содержание Primergy CX250 S2
Страница 6: ...Upgrade and Maintenance Manual CX250 S2 ...
Страница 16: ...16 Upgrade and Maintenance Manual CX250 S2 ...
Страница 20: ...20 Upgrade and Maintenance Manual CX250 S2 Introduction ...
Страница 30: ...30 Upgrade and Maintenance Manual CX250 S2 Before you start ...
Страница 44: ...44 Upgrade and Maintenance Manual CX250 S2 Important information ...
Страница 184: ...184 Upgrade and Maintenance Manual CX250 S2 Main memory ...
Страница 194: ...194 Upgrade and Maintenance Manual CX250 S2 Processors Figure 106 Opening the load plate B Ê Fully open the load plate ...
Страница 244: ...244 Upgrade and Maintenance Manual CX250 S2 System board and components ...
Страница 254: ...254 Upgrade and Maintenance Manual CX250 S2 Cabling ...