CX250 S2
Upgrade and Maintenance Manual
131
Expansion cards and battery backup units
6.5.1
Installing the mezzanine SAS RAID controller
6.5.1.1
Required tools
●
Preliminary and concluding steps: tool-less
●
Main steps:
– Phillips PH2 / (+) No. 2 screw driver
6.5.1.2
Preliminary steps
Perform the following procedures:
Ê
"Disabling SVOM boot watchdog functionality" on page 65
Ê
Locate the desired server node with the ID button.
Ê
"Shutting down the server node" on page 45
Ê
"Removing the server node from the server enclosure" on page 46
Ê
"Removing the mezzanine card bracket" on page 47
Ê
"Installing the linking board" on page 54
Upgrade and Repair Units (URU)
Average hardware task duration: 10 minutes
Average software task duration: 5 minutes
Содержание Primergy CX250 S2
Страница 6: ...Upgrade and Maintenance Manual CX250 S2 ...
Страница 16: ...16 Upgrade and Maintenance Manual CX250 S2 ...
Страница 20: ...20 Upgrade and Maintenance Manual CX250 S2 Introduction ...
Страница 30: ...30 Upgrade and Maintenance Manual CX250 S2 Before you start ...
Страница 44: ...44 Upgrade and Maintenance Manual CX250 S2 Important information ...
Страница 184: ...184 Upgrade and Maintenance Manual CX250 S2 Main memory ...
Страница 194: ...194 Upgrade and Maintenance Manual CX250 S2 Processors Figure 106 Opening the load plate B Ê Fully open the load plate ...
Страница 244: ...244 Upgrade and Maintenance Manual CX250 S2 System board and components ...
Страница 254: ...254 Upgrade and Maintenance Manual CX250 S2 Cabling ...