152
Upgrade and Maintenance Manual
CX250
S2
Expansion cards and battery backup units
6.6.1.5
Concluding steps
Perform the following procedures:
Ê
If applicable, re-install the expansion cards as described in section
"Installing expansion cards" on page 102
.
Ê
"Installing the server node in the server enclosure" on page 63
Ê
If applicable, reconnect all external cables.
Ê
"Switching on the server node" on page 64
Ê
"Enabling boot watchdog functionality" on page 74
Содержание Primergy CX250 S2
Страница 6: ...Upgrade and Maintenance Manual CX250 S2 ...
Страница 16: ...16 Upgrade and Maintenance Manual CX250 S2 ...
Страница 20: ...20 Upgrade and Maintenance Manual CX250 S2 Introduction ...
Страница 30: ...30 Upgrade and Maintenance Manual CX250 S2 Before you start ...
Страница 44: ...44 Upgrade and Maintenance Manual CX250 S2 Important information ...
Страница 184: ...184 Upgrade and Maintenance Manual CX250 S2 Main memory ...
Страница 194: ...194 Upgrade and Maintenance Manual CX250 S2 Processors Figure 106 Opening the load plate B Ê Fully open the load plate ...
Страница 244: ...244 Upgrade and Maintenance Manual CX250 S2 System board and components ...
Страница 254: ...254 Upgrade and Maintenance Manual CX250 S2 Cabling ...