
6-37
6 Maintenance
897N201058J FDC NX700 Instruction Manual 2022.04
6.9.4 Replacing the PF pump tube
WARNING:
Before the following procedure, always switch off the power of the analyzer, and unplug the power
cord.
Replace the PF Tube once a year. Replacement is also necessary if the PF has not been used for
one month or longer.
1. Remove the disposal box, and remove
the front bottom cover.
Cover (B)
Screw (A)
2. Loosen the screw (A) and remove the
cover (B).
Holder (C)
Tube (D)
3. Slide the holder (C) to the left and re-
move the tube (D) from the rotor.
Front bottom cover
6
Содержание FUJI DRI-CHEM NX700
Страница 2: ......
Страница 22: ......
Страница 72: ......
Страница 114: ......
Страница 126: ......
Страница 166: ......
Страница 173: ...8 Troubleshooting 8 3 897N201058J FDC NX700 Instruction Manual 2022 04 8 ...
Страница 216: ......
Страница 258: ......
Страница 262: ...11 USM User Safety Mode 11 4 897N201058J FDC NX700 Instruction Manual 2022 04 ADM All functions are operable 11 ...
Страница 272: ......
Страница 274: ......
Страница 275: ......