
6-33
6 Maintenance
897N201058J FDC NX700 Instruction Manual 2022.04
If the check results are [NG], tap the [Cleaning]
button, clean the PF unit, and then run the leak
test again.
If this does not resolve the problem, tap the
[Procedure] button, and then check the attach-
ment or replace the PF pump tube to using the
procedure on the following page.
NOTE
If the [Result details] button is tapped,
the Advanced leak check results display
screen appears.
NOTE
The check results can be printed by tap-
ping the
button.
7. Once the check ends, remove the PF
sample rack and PF leak check tool.
6
Содержание FUJI DRI-CHEM NX700
Страница 2: ......
Страница 22: ......
Страница 72: ......
Страница 114: ......
Страница 126: ......
Страница 166: ......
Страница 173: ...8 Troubleshooting 8 3 897N201058J FDC NX700 Instruction Manual 2022 04 8 ...
Страница 216: ......
Страница 258: ......
Страница 262: ...11 USM User Safety Mode 11 4 897N201058J FDC NX700 Instruction Manual 2022 04 ADM All functions are operable 11 ...
Страница 272: ......
Страница 274: ......
Страница 275: ......