
3 - 17
INZ-TN2ZKJ-E
• Zero calibration
• Span calibration
Zero calibration
output
Zero calibration
output
Pump ON/OFFcontact
Pump ON/OFFcontact
Sample selection
output
CH1 to 5 span
calibration output
CH1 to 5 span
calibration output
Output hold function
Sample selection
output
(with hold ON setting)
ZERO
ENT
ENT
Hold extension time.
Calibration gas flow
Calibration gas flow
Output signal hold
Output signal hold
Calibration end
Calibration end
on
off
on
off
on
off
off
Output hold function
(with hold ON setting)
SPAN
ENT
ENT
Hold extemsion time.
Note)
When selecting
CH2 using
DOWN and UP
keys.
For CH1 span
calibration
The hold extension time
depends on the gas
flow time of the
automatic calibration
settings.
(7) Timing of solenoid valve drive signal for calibration
q
q
q
q
q
Manual calibration (see “Item 6.9 Calibration”.)