![Fuji Electric ZaFe Скачать руководство пользователя страница 23](http://html1.mh-extra.com/html/fuji-electric/zafe/zafe_instruction-manual_2341901023.webp)
4 - 1
INZ-TN4ZAFE-E
4.1 Preparation for operation
4.1.1 Check of gas sampling tube, exhaust tube and wiring
Check that the pipes are correctly connected to the gas sampling port and drain port. Check that the ana-
lyzer is correctly wired as specified
.
4.2 operating procedure
(1) In one or two seconds, the measurement screen will appear at the front panel.
(2) About 30 minutes warm-up operation
About 30 minutes are needed until the operating performance is stabilized. Warm-up operation should
be continued with the power ON.
(3) Setting of various set values
Set required set values according to Chapter 6, “Setting and calibration”.
(4) Zero and span calibration
Perform zero calibration and span calibration after warm-up operation.
See Chapter 6.7, “Manual Calibration”.
(5) Introduction and measurement of measured gas
Start measurement by introducing measured gas into the analyzer.
4. oPERAtIon